South Africa: rules and approvals
Electrical safety for some products is handled through SABS certificates of conformity and an NRCS letter of authority, which are separate from ICASA's radio approval.
A Zone 1 / Zone 21 smartphone for crews at the Secunda and Sasolburg complexes, the Natref and Cape Town refineries, Mossel Bay, the fuel terminals and the surface plants of South African mining. ICASA, based in Centurion, sets radio type approval, relying on EU test reports for spectrum, EMC and electrical safety, and a conformity label must be affixed to the equipment and the packaging. Distribution partners for South Africa are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. South Africa has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | South Africa: Milnerton, Cape Town, Mossel Bay, Western Cape, Durban | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in South Africa. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS South Africa market guide.
Electrical safety for some products is handled through SABS certificates of conformity and an NRCS letter of authority, which are separate from ICASA's radio approval.
The 1886 discovery on the Witwatersrand started the gold rush that built Johannesburg's mining industry, and the country is still fifth in world gold production by one account.
South Africa is the world's largest producer of chrome, manganese, platinum and vanadium and the third-largest coal exporter, so mining is a major source of hazardous-area work.
The code references a family of SANS standards, including SANS 10086 on installation, inspection and maintenance of equipment in explosive atmospheres, SANS 1489 on connectors and SANS 1515 on gas measuring equipment for mines.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In South Africa. IECEx is the foundation for South Africa: the IS-04Z1 IECEx programme is in progress, and the South African Ex certificate is planned to follow it. For international contractors visiting Secunda or Sasolburg, a certificate of conformity with its schedule of conditions would be the reference document, read alongside the local approval once available.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for South Africa yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for South Africa covers Secunda, Mpumalanga, Sasolburg, Free State, Milnerton, Cape Town, Mossel Bay, Western Cape, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for South Africa.
Underground mines typically use Group I classification, with methane and coal-dust risks, while surface plants use Group II and III. SANS standards such as SANS 1515 cover mine gas-measuring equipment. Ask the mine or plant engineer which group and protection level the area drawing specifies before ordering.
Yes. The National Code of Practice for Electrical Machinery in Hazardous Locations sits under the Occupational Health and Safety Act 1993 and refers to SANS standards. Mines also have their own regulations and standards, so confirm which rules apply with the site's engineering and compliance team.
No. Underground mining is equipment Group I, which is outside the scope of this device. The IS-04Z1 targets surface areas such as coal handling plants and process units using Zone 1 and Zone 21. Confirm the area and equipment group with the mine's safety officer.
Related guides for South Africa and for South Africa.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.