Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Saudi Arabia · IECEx

IECEx Mobile Phone Distributor in Saudi Arabia

The IS-04Z1 is a Zone 1 and Zone 21 handset for people who work inside classified areas in the Kingdom: field operators, maintenance and inspection engineers, and the HSE and telecoms teams who equip them. The Communications, Space and Technology Commission issues type approval certificates valid for two years, with no local representative required; Saudi Standards, Metrology and Quality Organization safety certification needs a local representative. An IECEx mobile phone distributor in Saudi Arabia would carry the IS-04Z1 to these buyers once certification completes.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Saudi Arabia, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicIECEx
DeviceMobile Phone
RouteDistribution
WhereSaudi Arabia

Short answer. Saudi Arabia has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.

At a glance · IECEx

Checklist: IECEx mobile phone for Saudi Arabia

What to check, and where the IS-04Z1 stands today
CheckWhat to look forIS-04Z1 today
Certificate of conformityNumber checkable on the IECEx online registerIn progress; not issued
Standards editionThe IEC 60079 edition the certificate citesStated on the certificate when issued
Schedule of conditionsLimits of use, batteries and accessoriesPublished with the certificate
Where it appliesSaudi Arabia: Ghawar, Shaybah, KhuraisClassified by the site operator
Product · Saudi Arabia

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Saudi Arabia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Saudi Arabia

Where this applies in Saudi Arabia

The classified areas, operators and sites below are the ones covered in the SAMS Saudi Arabia market guide.

Operators, EPCs and contractors

Saudi Aramco
Upstream, gas processing, refining and export across the Kingdom
SABIC
Olefins, polymers and fertiliser production at Jubail and Yanbu
SATORP
Aramco and TotalEnergies refinery and petrochemical complex, Jubail
YASREF
Aramco and Sinopec full-conversion refinery at Yanbu
Petro Rabigh
Integrated refining and petrochemicals on the Red Sea coast
Sadara Chemical
Mixed-feed cracker and specialty chemicals at Jubail

Industrial areas and sites

Abqaiq
Crude stabilisation and processing, Eastern Province
Ras Tanura
Refinery, tank farm and crude export terminal
Ghawar
Onshore field with continuous well and flowline work
Shaybah
Remote field and NGL plant in the Empty Quarter
Khurais
Central processing facility and associated gas handling
Fadhili
Gas plant east of Jubail, expanding under EPC award
Field notes · Saudi Arabia

More about Saudi Arabia that matters for portable equipment

Saudi Arabia: background

Ras Tanura Refinery was established in 1939 and is the largest refinery in Saudi Arabia, run by Saudi Aramco.

Saudi Arabia: infrastructure

Jubail has the world's largest independent water and power project, producing about 2,744 megawatts of electricity and 800,000 cubic metres of water daily.

Saudi Arabia: infrastructure

The Ju'aymah Gas Plant at Ras Tanura is recognised as the world's largest natural gas liquids fractionation plant.

Saudi Arabia: industry on the ground

Jubail Industrial City was designated in 1975 and is home to SABIC, while Jubail has a population of about 475,000 as of 2022.

The term · IECEx

What “IECEx” means for a smartphone

IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.

The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.

In Saudi Arabia. IECEx is the international reference that the large joint-venture sites at Jubail and Yanbu, including SATORP and YASREF, and their visiting contractors are likely to know. A certificate of conformity and its schedule of conditions would give those teams a common document to read. For the IS-04Z1 this certification is in progress and not yet issued.

The route · distribution

Distributing the IS-04Z1 in Saudi Arabia

SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Saudi Arabia yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.

What SAMS looks for in a partner

Operator relationships
Existing supplier registrations or a clear route to them with the main operators and contractors in Saudi Arabia.
Ex-competent staff
People who understand zone classification, markings and the conditions of a certificate.

And equally important

Local-language support
Documentation, training and helpdesk in the languages the workforce uses.
Service capability
Spares, battery replacement and repair routed through SAMS-approved channels.
Questions · Saudi Arabia

Frequently asked questions

Can we buy an IECEx mobile phone in Saudi Arabia today?

No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.

What does an IECEx mobile phone in Saudi Arabia cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

Does the IS-04Z1 hold an IECEx certificate?

No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.

Which sites in Saudi Arabia does this cover?

The market guide for Saudi Arabia covers Abqaiq, Ras Tanura, Ghawar, Shaybah, among others. Site-level pages are linked below.

How do I become a SAMS distributor for Saudi Arabia?

Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Saudi Arabia.

Who sets site equipment rules?

Saudi Aramco, SABIC and other large operators set their own supplier and equipment standards within national regulation, and the Royal Commission manages Jubail and Yanbu. Ask the end user for its approved-vendor requirements before shipping any device.

Where are Saudi Arabia's main industrial hazardous-area clusters?

Jubail and Ras Tanura on the Gulf coast, Yanbu on the Red Sea, and many Saudi Aramco fields and plants inland. Jubail and Yanbu are managed by the Royal Commission.

How would a handset last a shift at a remote Saudi field site?

The 4,000 mAh battery is specified for a full shift, because recharging inside a classified area is not possible and stores can be far away. Actual runtime depends on camera, torch and GNSS use, so test it on a real round during an evaluation.

Enquiry · Saudi Arabia

Ask about the IS-04Z1 for Saudi Arabia

Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.

Enquiry · Saudi Arabia

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Saudi Arabia?

Name the site and the operator and we will send what is available before launch.