Remote logistics
Personnel and spares move by helicopter and supply vessel, so a failed device may take days to replace.
Indonesia's offshore oil and gas is spread across the Natuna area, the Java Sea and the Kutai Basin off East Kalimantan, where the Mahakam block is run by Pertamina Hulu Mahakam. Platforms and FPSOs are Zone 1 environments for process, drilling and maintenance crews. An IECEx mobile phone distributor in Offshore Indonesia would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Offshore Indonesia has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Offshore Indonesia: Drilling and workover areas, Gas processing modules, Wellhead and production platforms | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Offshore Indonesia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Personnel and spares move by helicopter and supply vessel, so a failed device may take days to replace.
Offshore units for fields such as Belanak in the Natuna Sea have been fabricated at yards in Batam before sailing out.
Natuna had about 84,900 inhabitants in 2025, around 80 percent of Malay origin, and Indonesian and local Malay are the main languages, which helps visiting crews working with local contractors.
Natuna Regency, the northernmost part of Riau Islands Province, has only 1,984 sq km of land within a total area of about 264,198 sq km, so almost all of it is open sea.
The Tangguh field in Bintuni Bay, West Papua, was estimated to hold 4.4 trillion cubic feet of proven gas, with annual LNG output expected to reach about 7.6 million tonnes.
Indonesia produced about 450.8 million tonnes of oil equivalent of energy in 2019, and its total primary energy supply rose by nearly 60 percent between 2000 and 2021.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Offshore Indonesia. Fields in the Natuna, Java Sea and Kutai Basin involve international partners and fabrication yards, so IECEx documents travel well. A certificate of conformity with a schedule of conditions would be reviewed. For the IS-04Z1 they are targets, not issued papers.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Offshore Indonesia yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are wellhead and production platforms, fpsos and floating production units, drilling and workover areas, gas processing modules. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Offshore Indonesia.
Seas and weather vary through the year, with monsoon periods affecting boat and helicopter schedules, so deliveries of spares can be delayed. Devices should be rated for humidity, salt and rain, and spares should be carried to cover a longer supply gap.
Typically by air to Ranai on Natuna Island and then by supply boat or helicopter to the installation, though routes depend on the operator. Check the operator's mobilisation instructions and baggage limits for electronic equipment well before travel.
Because personnel and spares move by helicopter and supply vessel, replacement can take days. Plan spare units and offline-capable apps. The operator may require approval before mobilisation. Confirm logistics with the operator's offshore team.
Other guides for Offshore Indonesia, other places in Indonesia, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.