Leith
In December 2024 Forth Ports announced a 50 million pound private investment at the Port of Leith after winning its largest offshore wind contract, for the 1.1 GW Inch Cape project. Foundations are handled at Leith.
Edinburgh is Scotland's capital and has few classified areas itself. Its Port of Leith is being developed for offshore wind, while the Grangemouth petrochemical complex lies further up the Forth, where hazardous-area demand is concentrated. Distribution partners for Edinburgh, Leith and the Forth are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Edinburgh, Leith and the Forth has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Edinburgh, Leith and the Forth: Fuel import and storage terminal at Grangemouth, Ethane import and storage, Port and offshore wind foundation handling | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Edinburgh. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
In December 2024 Forth Ports announced a 50 million pound private investment at the Port of Leith after winning its largest offshore wind contract, for the 1.1 GW Inch Cape project. Foundations are handled at Leith.
The INEOS site on the Firth of Forth houses the last operating ethylene cracker in the UK and imports US ethane. Grangemouth is Scotland's largest container port.
Traditional industries of printing, brewing and distilling grew in the 19th century alongside rubber and engineering works, so the city has long had solvent, grain-dust and spirit-storage sites.
Edinburgh Airport lies 9 km west of the city centre just off the M8 and M9 motorways; it is Scotland's busiest, with 15.8 million passengers in 2024 and over 150 international destinations.
Leith has been Edinburgh's port since at least the royal charter of 1329, and it retains a separate identity at the mouth of the Water of Leith, though the last shipyard there has closed.
A green belt designated in 1957 surrounds the city except at the Forth shoreline, and developments such as Edinburgh Airport and the Royal Highland Showground lie within it.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Edinburgh, Leith and the Forth. Leith's offshore wind foundation handling and Grangemouth's petrochemical operations attract international contractors who often work to IECEx documentation. The target is a certificate of conformity and a schedule of conditions that a project engineer can read against the specific area. That paperwork does not exist yet and must be confirmed once issued.
A distributor for Edinburgh, Leith and the Forth would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are port and offshore wind foundation handling, petrochemical process units at grangemouth, fuel import and storage terminal at grangemouth, ethane import and storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Edinburgh, Leith and the Forth.
Mostly it is an administrative and financial centre, with limited heavy industry. Whisky, brewing, fuel storage and port activity exist in and around the Forth, and larger process sites are elsewhere in Scotland, so confirm the site and operator before assuming a classification.
Edinburgh Airport lies within the green belt and the city has rail links across the Central Belt, so travel from other UK and European cities is straightforward. Plan equipment delivery by road freight and confirm gate procedures with each site.
Mostly no. The city has few classified areas, and the Port of Leith is being developed for offshore wind foundation handling. The petrochemical complex and fuel import terminal are at Grangemouth, up the Forth. Confirm with the site operator which area a given task falls into before choosing equipment.
Other guides for Edinburgh, other places in United Kingdom, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.