Austria: logistics and access
Transport used 31.3% of energy in 2021, the largest share of any sector, and the last coal plant closed in 2020, so fuel logistics and gas networks are the main thermal energy infrastructure.
The IS-04Z1 is an ex proof phone designed to ATEX 2014/34/EU for gas and dust atmospheres, built for refinery turnarounds, gas stations on the transit grid, steel works and fibre plants. Imported oil supplied 35.4% of energy consumed in 2022 and gas 16.8%, so pipelines, storage and distribution terminals form a large share of Austria's flammable-materials infrastructure. An IECEx mobile phone distributor in Austria would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Austria has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Austria: Linz, Donawitz and Leoben, The Vienna basin | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Austria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Austria market guide covers.
Transport used 31.3% of energy in 2021, the largest share of any sector, and the last coal plant closed in 2020, so fuel logistics and gas networks are the main thermal energy infrastructure.
Directive 2014/34/EU became mandatory for manufacturers on 20 April 2016, and Directive 1999/92/EC requires employers to divide workplaces into zones by the likelihood and persistence of an explosive atmosphere.
More than 3,000 hydro plants provided 54% of installed generating capacity in 2021, and Verbund generates about 90% of its power from hydro, so dam and turbine-hall work dominates the electricity side.
OMV opened the Schwechat refinery near Vienna in 1960, and since 1970 the Adria-Vienna Pipeline has delivered crude from the marine terminal at Trieste, Italy, to Schwechat.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Austria. Inside Austria ATEX does the legal work, so IECEx matters mainly where an international operator or contractor brings its own global specification, for example a group working across OMV, Borealis or Wacker Chemie sites and non-EU plants. The certificate of conformity and schedule of conditions would then be read alongside the ATEX certificate. Both are in progress.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Austria yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Austria covers Schwechat, Baumgarten an der March, Linz, Donawitz and Leoben, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Austria.
Yes, as an EU member Austria applies ATEX Directive 2014/34/EU to equipment, and workplaces are zoned under Directive 1999/92/EC. Devices for Zone 1 or Zone 2 areas normally need the Ex marking, CE marking and documentation. Check the operator's list of accepted categories.
OMV AG is the largest energy business, with integrated oil, gas and petrochemical activity, so it is a major source of classified areas. Other sites include chemical plants and utility sites. Supplier approval is run by each company, so contact its procurement and safety teams.
No: ATEX 2014/34/EU, transposed by the Explosionsschutzverordnung 2015, is the whole product-side requirement and there is no separate Austrian product approval. The employer's duties sit under the VEXAT, which is where evaluation time goes. SAMS holds no ATEX certificate yet. Confirm what your site's explosion protection document needs.
Related guides for Austria and for Austria.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.