Egypt: industry on the ground
Egypt's LNG plants at Damietta and Idku are operated by Egyptian LNG and SEGAS LNG, and gas supplied 84 per cent of Egypt's electricity in 2023.
The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in Egypt every shift: Gulf of Suez platform crews, LNG terminal operators, refinery engineers and the HSE and telecoms teams who equip them. This page sets out how an IECEx cell phone supply route to Egypt will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx cell phone for Egypt cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Egypt: Suez, Alexandria / Amreya, Gulf of Suez | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Egypt. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Egypt market guide covers.
Egypt's LNG plants at Damietta and Idku are operated by Egyptian LNG and SEGAS LNG, and gas supplied 84 per cent of Egypt's electricity in 2023.
The Arab Gas Pipeline was developed to carry gas to Jordan, Syria and Lebanon, with a planned total length of 1,200 kilometres, showing how pipeline and compressor sites extend beyond the Delta.
Zohr, found by Eni in 2015 in the Shorouk Block 190 kilometres north of Port Said, holds an estimated 30 trillion cubic feet of gas, and production began in December 2017.
Electrical safety and general product conformity are overseen separately by the Egyptian Organization for Standardization and Quality and the General Organization for Export and Import Control.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Egypt. IECEx is the technical basis EGPC and its operating affiliates work from, and it is the link to international operators such as Eni at Zohr and to contractors at Idku and Damietta. The reviewer reads the certificate of conformity and the schedule of conditions. EOS conformity and NTRA radio approval are separate, and none of the three is finished.
Nothing can be bought for Egypt today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Egypt covers Gulf of Suez, Zohr field, Idku, Damietta, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Western Desert and Gulf of Suez sites typically combine high summer heat, dust and wind-blown sand, with salt air on the coast. Check the operating temperature range, dust ingress rating and enclosure corrosion resistance, and confirm any site limits with the operator or contractor.
Yes. NTRA covers radio and telecom approval, while the Egyptian Organization for Standardization and Quality and the General Organization for Export and Import Control cover electrical safety and general product conformity. A device with batteries or chargers may need to satisfy both, so check each body's scope.
No: EGPC and its operating affiliates, along with international operators like Eni, each run vendor-registration and engineering-approval processes, so conformity alone does not guarantee listing. EOS and NTRA approvals are being pursued and are not finished. Confirm the route with the operator's procurement team.
Related guides for Egypt and for Egypt.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.