Saudi Arabia: background
Ras Tanura Refinery was established in 1939 and is the largest refinery in Saudi Arabia, run by Saudi Aramco.
The IS-04Z1 is a Zone 1 and Zone 21 handset for people who work inside classified areas in the Kingdom: field operators, maintenance and inspection engineers, and the HSE and telecoms teams who equip them. The Communications, Space and Technology Commission issues type approval certificates valid for two years, with no local representative required; Saudi Standards, Metrology and Quality Organization safety certification needs a local representative. Distribution partners for Saudi Arabia are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Saudi Arabia has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Saudi Arabia: Ghawar, Shaybah, Khurais | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Saudi Arabia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Saudi Arabia market guide.
Ras Tanura Refinery was established in 1939 and is the largest refinery in Saudi Arabia, run by Saudi Aramco.
Jubail has the world's largest independent water and power project, producing about 2,744 megawatts of electricity and 800,000 cubic metres of water daily.
The Ju'aymah Gas Plant at Ras Tanura is recognised as the world's largest natural gas liquids fractionation plant.
Jubail Industrial City was designated in 1975 and is home to SABIC, while Jubail has a population of about 475,000 as of 2022.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Saudi Arabia. IECEx is the international reference that the large joint-venture sites at Jubail and Yanbu, including SATORP and YASREF, and their visiting contractors are likely to know. A certificate of conformity and its schedule of conditions would give those teams a common document to read. For the IS-04Z1 this certification is in progress and not yet issued.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Saudi Arabia. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Saudi Arabia covers Abqaiq, Ras Tanura, Ghawar, Shaybah, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Saudi Arabia.
Saudi Aramco, SABIC and other large operators set their own supplier and equipment standards within national regulation, and the Royal Commission manages Jubail and Yanbu. Ask the end user for its approved-vendor requirements before shipping any device.
Jubail and Ras Tanura on the Gulf coast, Yanbu on the Red Sea, and many Saudi Aramco fields and plants inland. Jubail and Yanbu are managed by the Royal Commission.
The 4,000 mAh battery is specified for a full shift, because recharging inside a classified area is not possible and stores can be far away. Actual runtime depends on camera, torch and GNSS use, so test it on a real round during an evaluation.
Other guides for Saudi Arabia, other places in Saudi Arabia, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.