Poland: industry on the ground
The Płock refinery and petrochemical complex is the largest oil refinery in Poland, and Orlen's headquarters are in the same city, with servicing and construction firms clustered around the plant.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refinery, fertiliser and gas terminal work where Polish teams actually meet an explosive atmosphere. Poland's energy sector is the fifth largest in Europe, with an installed electricity capacity of about 61 GW at the end of 2024, so power plants and mines are large sources of classified areas. Distribution partners for Poland are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Poland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Poland: Włocławek, Puławy, Police | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Poland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Poland market guide.
The Płock refinery and petrochemical complex is the largest oil refinery in Poland, and Orlen's headquarters are in the same city, with servicing and construction firms clustered around the plant.
Coal use splits into 75.6% for electricity and heat, 14.5% for industry and 9.9% for buildings, so industrial coal consumers beyond power plants also have dust and gas hazards.
Poland produced 78 megatonnes of hard coal and 57 megatonnes of brown coal in 2009, and a plan agreed in September 2020 aims to phase out coal by 2049.
In 2020 coal made up 69.5% of national energy production and 68.5% of electricity generation, so coal handling, bunkers and mills create combustible dust zones at many power sites.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Poland. Poland hosts large national operators and international contractors working inside operating plant fences. IECEx gives foreign partners a common reference alongside ATEX, the main product route here. Ask for the certificate of conformity and its schedule of conditions, which record the marking and conditions of use. The IS-04Z1 has none yet issued.
A distributor for Poland would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Poland covers Płock, Gdańsk, Włocławek, Puławy, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Poland.
Polish is the working language and ATEX instructions are typically expected in the language of the destination country. A Polish-language instruction sheet with certificate pack usually speeds up site acceptance. Ask the operator whether English documents are also accepted for contractors.
Poland is an EU member, so ATEX Directive 2014/34/EU applies to equipment and Directive 1999/92/EC to workplace zoning. Zone 1 and Zone 2 devices should carry CE and Ex markings with instructions in Polish. Operators and mines usually add their own approval rules.
The gas marking target is II 2 G Ex ib IIC T4, and Zone 21 dust protection belongs to the same programme, so one device is designed to cover both. Certification is in progress, so confirm the final marking and the plant's zone drawing with the operator.
Other guides for Poland, other places in Poland, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.