Entry and equipment approval are controlled by QatarEnergy and each plant operator, so site induction applies to contractors.
Qatargas reported its 10,000th non-LNG shipment through the Ras Laffan terminal in 2019, so the port also handles conventional cargo, not only gas carriers. It is Qatar's main site for liquefied natural gas and gas-to-liquids production, so Zone 1 gas areas are widespread across plants and the port. A hazardous area smartphone distributor in Ras Laffan Industrial City would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Ras Laffan Industrial City has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Ras Laffan Industrial City: Gas-to-liquids plants, Refinery process units, Port loading | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Ras Laffan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Entry and equipment approval are controlled by QatarEnergy and each plant operator, so site induction applies to contractors.
Ras Laffan Port encloses a water area of about 4,500 hectares and handles LNG and other liquid exports.
The Ras Laffan Emergency and Safety College, opened in 2013 on about 100 hectares, trains fire, rescue and hazardous-materials staff for the oil, gas and petrochemical sectors.
Planned industrial land at Ras Laffan was raised from about 106 to 296 square km in 2004, so the estate is large and plants are spread over long distances.
Ras Laffan sits at very low elevation on sandy soils about 80 km north of Doha, with a reef off the coast, so the site is flat, exposed and windblown.
The industrial city exists to process gas from the North Field, found in 1971 and described as the world's biggest natural gas field, covering roughly 6,000 square km offshore.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Ras Laffan Industrial City. Ras Laffan is a QatarEnergy-administered industrial city where classified areas include LNG production and storage, gas processing, GTL plants, refinery process units and port loading. The operator of each plant classifies its own areas. SAMS does not classify, so a buyer should obtain the area classification drawings from the plant before selecting equipment.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Ras Laffan Industrial City yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are lng production trains and storage, gas processing, gas-to-liquids plants, refinery process units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Ras Laffan Industrial City.
Many use the Ras Laffan Emergency and Safety College, which trains fire, rescue and hazardous-materials teams on a 100-hectare campus. Whether it is required for your visit depends on the plant operator, so ask the operator's HSE team.
The site is low-lying and exposed, so wind-blown sand and dust are common. Look for a sealed handset with a stated dust ingress rating, keep connector covers closed, and clean devices according to the manufacturer's instructions before taking them back into a classified area.
Entry and equipment approval are controlled by QatarEnergy and each plant operator, and contractors go through site induction. A new device would normally need approval from the plant before use in a classified area. Ask the operator for its current process, and expect it to differ between plants.
Other guides for Ras Laffan, other places in Qatar, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.