Coastal setting
Kerala's coast is generally humid with heavy monsoon rain, so ingress protection and corrosion resistance matter.
Aromatics production for benzene and toluene began in 1989, and a bitumen oxidation unit of 378,000 tonnes a year started in 2008. Refining, petrochemical, LNG and crude import handling create Zone 1 areas. Distribution partners for Kochi, Kerala are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Kochi, Kerala has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Kochi, Kerala: Single point mooring and crude pipelines, Petrochemical units, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kochi India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Kerala's coast is generally humid with heavy monsoon rain, so ingress protection and corrosion resistance matter.
The Kochi Refinery is about 12 km east of the city, is operated by BPCL and produces fuels plus petrochemical products such as benzene and toluene. An offshore single point mooring commissioned in 2007 receives crude from very large crude carriers.
The refinery was set up with a US partner, started construction in 1964 and brought its first unit on stream in September 1966, so its older units are over 55 years old.
The south-west monsoon from June to September brings heavy rain, annual rainfall is about 3,015 millimetres, and there are about 124 rainy days a year.
Capacity rose from 2.5 million tonnes in 1966 to 9.5 million by 2010, and a plan reported in 2014 aimed to reach 15.5 million with a new distillation unit.
Petronet LNG operates a terminal at Kochi, which received its 100th cargo in July 2022, alongside its larger terminal at Dahej.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Kochi, Kerala. Kochi's hazardous areas include refinery process units, LNG regasification and storage, the single point mooring with crude pipelines, and petrochemical units. BPCL and Petronet LNG classify their own areas. PESO is the national regulator, and SAMS has no role in classifying or approving any area.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Kochi, Kerala yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, lng regasification and storage, single point mooring and crude pipelines, petrochemical units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Kochi, Kerala.
The refinery began operating in 1966 and has been expanded in phases. Older and newer units may have different area classifications and rules, so ask the operator unit by unit.
A refinery has process units, tank farms and loading areas, and the LNG terminal has storage tanks and jetty areas, all with classified zones set by the operator. Request the area classification before bringing devices.
Heavy rain and humidity make sealing, drainage and corrosion resistance important for devices carried outdoors. A sealed IP68 design helps, and users should still dry and inspect it after wet shifts. Ask the operator about any limits on using handhelds outdoors in heavy rain.
Other guides for Kochi India, other places in India, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.