Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Italy · hazardous area

Hazardous Area Cell Phone Supplier in Italy

The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refineries, petrochemical poles and gas terminals from Porto Marghera to Priolo and Sarroch. This page sets out how a hazardous area cell phone supply route to Italy will work for the IS-04Z1, and what is and is not available before launch.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Italy, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topichazardous area
DeviceCell Phone
RouteSupply
WhereItaly

Short answer. A hazardous area cell phone for Italy cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · hazardous area

Checklist: hazardous area cell phone for Italy

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
Zone0, 1 or 2 for gas; 20, 21 or 22 for dustDesigned for Zone 1 and Zone 21
Gas groupIIA, IIB or IICIIC (target)
Area drawingThe operator's own classification drawingDecided by the site operator
Where it appliesItaly: Taranto, Brindisi, Priolo, Melilli and AugustaClassified by the site operator
Product · Italy

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Italy. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Italy

Where this applies in Italy

The classified areas, operators and sites below are the ones covered in the SAMS Italy market guide.

Operators, EPCs and contractors

Eni
Refining and biorefining at Sannazzaro, Taranto, Gela and Venice.
Versalis
The Eni petrochemical arm, with plants at Brindisi, Priolo and Ravenna.
Sarlux
Runs the Sarroch refinery and its power complex in Sardinia.
ISAB
Priolo Gargallo refinery, around 320,000 barrels a day.
Raffineria di Milazzo
Refinery and marine terminal on the north Sicilian coast.
Snam
National gas transmission, underground storage and regasification.

Industrial areas and sites

Priolo, Melilli and Augusta
The largest Sicilian petrochemical belt, refining and chemicals together.
Gela
South Sicilian coastal site, now producing biofuels.
Milazzo
Refinery and port on the Tyrrhenian side of Sicily.
Sarroch
Sardinian refinery of about 300,000 barrels a day.
Taranto
Refinery and heavy industry on the Ionian coast.
Brindisi
Petrochemical plant, power generation and port on the Adriatic.
Field notes · Italy

More about Italy that matters for portable equipment

Italy: geography and layout

The Val d'Agri area in Basilicata hosts the largest onshore hydrocarbon field in Europe, so upstream work extends to the south of the country as well as offshore.

Italy: geography and layout

Moderate natural gas reserves have been found mainly in the Po Valley and offshore in the Adriatic Sea, which concentrates gas production and processing in the north and east.

Italy: background

Hydropower was practically the only source of electricity until 1960, and all of Italy's active geothermal plants are in Tuscany, so dam and geothermal sites sit alongside oil and gas facilities.

Italy: who works there

Eni, which operates in 79 countries, is counted among the world's seven oil and gas supermajors, so Italian refineries and gas sites often follow large-operator procedures for contractors and equipment.

The term · hazardous area

What “hazardous area” means for a smartphone

A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.

No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.

In Italy. Italian classified areas include refineries in Sicily, Sardinia and the Adriatic, petrochemical plants at Brindisi and Ravenna, regasification terminals and gas transmission and storage sites. Many sites are coastal or on islands. The operator classifies each area, not SAMS. The IS-04Z1 is designed for Zone 1 and Zone 21.

The route · supply

Sourcing the IS-04Z1 for Italy

There is no stock to order for Italy yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · Italy

Frequently asked questions

Can we buy a hazardous area cell phone in Italy today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does a hazardous area cell phone in Italy cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

Which hazardous areas is the IS-04Z1 designed for?

Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.

Which sites in Italy does this cover?

The market guide for Italy covers Priolo, Melilli and Augusta, Gela, Milazzo, Sarroch, among others. Site-level pages are linked below.

How will SAMS supply Italy?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

Does Italy require ATEX certified phones in hazardous areas?

Italy applies ATEX Directive 2014/34/EU as an EU member, and employers zone workplaces under Directive 1999/92/EC. Devices for Zone 1 and Zone 2 should carry CE and Ex markings with Italian-language instructions where required. Operators usually add their own approval and permit procedures.

Where is upstream hazardous-area work in Italy?

The Val d'Agri area in Basilicata hosts the largest onshore hydrocarbon field in Europe, and the Po Valley and offshore Adriatic hold moderate gas reserves. Refineries, fuel terminals and gas stations add downstream sites. Confirm site lists with the operator.

Can a device be trialled during a fermata?

The market guide says teams can test a unit through a fermata while certification runs. Trial terms and site access are set by the plant operator, and a unit would need to be accepted for the zones it enters. Ask the operator's HSE team before arranging a trial.

Enquiry · Italy

Ask about the IS-04Z1 for Italy

Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.

Enquiry · Italy

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Italy?

Name the site and the operator and we will send what is available before launch.