Austria: logistics and access
Transport used 31.3% of energy in 2021, the largest share of any sector, and the last coal plant closed in 2020, so fuel logistics and gas networks are the main thermal energy infrastructure.
The IS-04Z1 is an ex proof phone designed to ATEX 2014/34/EU for gas and dust atmospheres, built for refinery turnarounds, gas stations on the transit grid, steel works and fibre plants. OMV AG, an integrated oil, gas and petrochemical group, is Austria's largest energy business, with a turnover of about 36 billion euros in 2021, and its refining and chemicals sites are typical Zone 1 and Zone 2 workplaces. A hazardous area cell phone distributor in Austria would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Austria has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Austria: Linz, Donawitz and Leoben, The Vienna basin | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Austria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Austria market guide.
Transport used 31.3% of energy in 2021, the largest share of any sector, and the last coal plant closed in 2020, so fuel logistics and gas networks are the main thermal energy infrastructure.
Imported oil supplied 35.4% of energy consumed in 2022 and gas 16.8%, so pipelines, storage and distribution terminals form a large share of Austria's flammable-materials infrastructure.
Directive 2014/34/EU became mandatory for manufacturers on 20 April 2016, and Directive 1999/92/EC requires employers to divide workplaces into zones by the likelihood and persistence of an explosive atmosphere.
More than 3,000 hydro plants provided 54% of installed generating capacity in 2021, and Verbund generates about 90% of its power from hydro, so dam and turbine-hall work dominates the electricity side.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Austria. Austria is landlocked and its hazardous areas are processing rather than production: the refinery and tank farm at Schwechat, gas at Baumgarten, steel at Linz and Donawitz, fibre at Lenzing and fermentation at Kundl. A day can move from Zone 1 to Zone 21 within one company. Under the VEXAT the employer classifies the areas, not SAMS.
A distributor for Austria would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
The market guide for Austria covers Schwechat, Baumgarten an der March, Linz, Donawitz and Leoben, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Austria.
Yes, as an EU member Austria applies ATEX Directive 2014/34/EU to equipment, and workplaces are zoned under Directive 1999/92/EC. Devices for Zone 1 or Zone 2 areas normally need the Ex marking, CE marking and documentation. Check the operator's list of accepted categories.
OMV AG is the largest energy business, with integrated oil, gas and petrochemical activity, so it is a major source of classified areas. Other sites include chemical plants and utility sites. Supplier approval is run by each company, so contact its procurement and safety teams.
No: ATEX 2014/34/EU, transposed by the Explosionsschutzverordnung 2015, is the whole product-side requirement and there is no separate Austrian product approval. The employer's duties sit under the VEXAT, which is where evaluation time goes. SAMS holds no ATEX certificate yet. Confirm what your site's explosion protection document needs.
Other guides for Austria, other places in Austria, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.