Remote location
The waterway is a deep natural harbour at the western end of Wales, so contractors often travel in for turnarounds.
Oil refining at Milford Haven began with the first oil terminal and refinery in 1960, and the waterway still carries the jetties, oil terminals and shore processing facilities of the oil and power industries. It hosts Valero's Pembroke refinery and the South Hook and Dragon LNG terminals, so Zone 1 work arises at process units, tank farms and gas handling areas. Distribution partners for Wales (Milford Haven Waterway) are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Wales (Milford Haven Waterway) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Protection concept | Flameproof (Ex d) or intrinsic safety (Ex i) | Intrinsic safety, level ib |
| Zone suitability | Zone 1 gas and Zone 21 dust | Design target for Zone 1 and 21 |
| Certificate | Number, issuing body and schedule of conditions | In progress; not issued |
| Where it applies | Wales (Milford Haven Waterway): Crude and product jetties, Tank farms, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Wales. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The waterway is a deep natural harbour at the western end of Wales, so contractors often travel in for turnarounds.
The Pembroke refinery began operating in 1964 and has been owned by Valero since 2011. Cardiff terminal supply by coastal tanker comes from here.
Two LNG terminals, South Hook on a former refinery site and Dragon LNG on a former Gulf refinery site, were built from 2006 and could eventually supply about 25% of the UK's gas needs.
Regasified LNG leaves Milford Haven through National Grid's South Wales Gas Pipeline to a distribution point at Tirley in Gloucestershire, so pipeline and compression sites run across south Wales.
By 2018 Wales generated over 3,864 MW of renewable energy from 68,728 projects, and the Welsh Government set a target of meeting 70% of electricity demand from Welsh renewables by 2030.
Milford Haven is the largest port in Wales and the third-largest in the United Kingdom, run by the Milford Haven Port Authority as a trust port that manages Milford Docks, Milford Marina and Pembroke Port.
“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.
The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.
In Wales (Milford Haven Waterway). On the waterway, 'explosion-proof' covers refinery process units, LNG storage and regasification, crude and product jetties and tank farms. Flameproof Ex d suits fixed items, while intrinsic safety suits a handheld used on rounds. Each operator chooses the concept for its own areas, and LNG areas can differ from refinery areas.
A distributor for Wales (Milford Haven Waterway) would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.
Likely candidates are refinery process units, lng storage and regasification, crude and product jetties, tank farms. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Wales (Milford Haven Waterway).
English is normally sufficient for industrial site documentation in Wales, although some public-sector bodies use bilingual material. For plant equipment, operators typically require English manuals and safety information, but confirm the expectation with each site's procurement team.
The Milford Haven Waterway in Pembrokeshire is the best-known cluster, with oil and LNG terminals, jetties and processing plants, and there are gas pipelines, power stations, chemical works and fuel depots elsewhere in south and north Wales. Zoning is site-specific, so ask each operator for area drawings.
The waterway lies at the western end of Wales, so contractors often travel in for turnarounds, and equipment must arrive and be signed in on schedule. Plan delivery, charging and device enrolment before the work starts, and ask each operator how contractor equipment is checked on arrival.
More on Wales, and on other places in United Kingdom.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.