India: rules and approvals
Telecom approvals involve TEC's MTCTE scheme, WPC Equipment Type Approval for radio equipment, BIS registration for electronics, and trusted-source designation for equipment connected to licensed networks.
The IS-04Z1 is designed for people who work inside classified areas at Indian refineries, gas plants, LNG jetties and API blocks: field operators, inspection engineers, shift in-charges, and the HSE and materials teams whose sign-off a device has to survive. India's first oil deposits were found near Digboi in Assam in 1889, and its gas industry began in the 1960s with discoveries in Assam and the Mumbai High field. An explosion proof smartphone distributor in India would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. India has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Protection concept | Flameproof (Ex d) or intrinsic safety (Ex i) | Intrinsic safety, level ib |
| Zone suitability | Zone 1 gas and Zone 21 dust | Design target for Zone 1 and 21 |
| Certificate | Number, issuing body and schedule of conditions | In progress; not issued |
| Where it applies | India: Hazira and Surat, Vadodara, Koyali, Ankleshwar, Mumbai and the offshore basin | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS India market guide.
Telecom approvals involve TEC's MTCTE scheme, WPC Equipment Type Approval for radio equipment, BIS registration for electronics, and trusted-source designation for equipment connected to licensed networks.
The Jamnagar refinery in Gujarat, commissioned in July 1999, now has installed capacity of 1.24 million barrels a day, the most at any single location in the world.
A July 2025 PESO procedure accepts an IECEx certificate with test report for all manufacturers, and EU-type examination certificates only from EU-based manufacturers.
PESO approval from the Chief Controller of Explosives is required for Ex electrical apparatus at petroleum, gas cylinder and pressure vessel premises, under rules such as the Petroleum Rules 2002.
“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.
The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.
In India. Explosion-proof and flameproof are used loosely in India, but the real choice is between concepts: flameproof Ex d for enclosures and intrinsic safety for a handset moved around plant. At refineries, gas plants and LNG jetties the IS-04Z1 is designed around intrinsic safety rather than a heavy flameproof housing.
A distributor for India would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.
The market guide for India covers Jamnagar, Gujarat, Dahej and the Gujarat PCPIR, Hazira and Surat, Vadodara, Koyali, Ankleshwar, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for India.
PESO approval is required for Ex electrical apparatus at petroleum, gas cylinder and pressure vessel premises, and imports are applied for through an Indian service provider or distributor. Whether it applies to a given site depends on the licensing category, so ask the site's safety team and a PESO consultant.
Typically the large coastal refineries such as Jamnagar, offshore platforms in the Western Offshore region, petrochemical and fertiliser complexes, and gas fields in Assam and Gujarat. Each operator issues its own area classification, so request the drawing, gas group and temperature class first.
The market guide lists PESO, BIS and WPC approvals as in progress, alongside IECEx. None has been granted yet. Which are needed for a given site depends on the operator and the regulator, so ask the site operator and check the current status before ordering.
More on India, and on other places in India.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.