France: infrastructure
Nuclear power produces around 70% of France's electricity from 56 active reactors in 2023, so large plant outages bring many contractors to a small number of sites.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, aimed at the refineries, chemical platforms and LNG terminals that make up the French Seveso estate. This page sets out how an explosion proof cell phone supply route to France will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An explosion proof cell phone for France cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Protection concept | Flameproof (Ex d) or intrinsic safety (Ex i) | Intrinsic safety, level ib |
| Zone suitability | Zone 1 gas and Zone 21 dust | Design target for Zone 1 and 21 |
| Certificate | Number, issuing body and schedule of conditions | In progress; not issued |
| Where it applies | France: Feyzin and the Vallée de la Chimie, Roussillon and Salaise, Gonfreville-l'Orcher | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in France. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS France market guide.
Nuclear power produces around 70% of France's electricity from 56 active reactors in 2023, so large plant outages bring many contractors to a small number of sites.
Le Havre is France's second-largest commercial port by tonnage and its largest for containers, managed since 2008 by the state agency Grand Port Maritime du Havre, a key entry point for imported equipment.
Hydropower has 20 GW of installed capacity and supplies around 10% of French electricity, and renewables provided 26% of national consumption in 2022.
The Lacq gas field in Nouvelle-Aquitaine was discovered in 1950 and began production in 1958; its sour gas comes from about 4,000 metres depth.
“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.
The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.
In France. In France the phrase explosion-proof covers several concepts. Flameproof Ex d suits some heavy equipment, whereas an intrinsically safe handset limits energy at source. For refinery units, LNG terminals at Montoir and Fos, and hydrogen networks, the IS-04Z1 is designed around intrinsic safety rather than a heavy flameproof enclosure.
Supply of the IS-04Z1 to France starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.
The market guide for France covers Gonfreville-l'Orcher, Port-Jérôme, Donges, Montoir-de-Bretagne, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
The Fos-sur-Mer and Marseille coast combines a gas terminal, steel, chemistry and oil industries, and the country also has many nuclear and hydro sites. Details of individual plants and zones come from each operator, so request their site layout and approval procedure.
Yes, as an EU member France applies ATEX Directive 2014/34/EU to equipment and zoning under Directive 1999/92/EC. Zone 1 or Zone 2 devices should carry CE and Ex markings with instructions in French. Operators usually add their own approval and permit rules.
Android lets the interface language be set per user, and a fleet can be managed through EMM or MDM. Confirm the exact language support and any locked configuration on the datasheet. Contractor crews often prefer a common set-up agreed before a shutdown.
More on France, and on other places in France.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.