Austria: industry on the ground
Machinery and equipment, vehicles, chemicals, metals, and iron and steel are leading sectors, so chemical plants, foundries and paint and coating lines add solvent and dust hazards beyond oil and gas.
The IS-04Z1 is an ex proof phone designed to ATEX 2014/34/EU for gas and dust atmospheres, built for refinery turnarounds, gas stations on the transit grid, steel works and fibre plants. Buyers searching for an explosion proof cell phone supplier for Austria can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An explosion proof cell phone for Austria cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Protection concept | Flameproof (Ex d) or intrinsic safety (Ex i) | Intrinsic safety, level ib |
| Zone suitability | Zone 1 gas and Zone 21 dust | Design target for Zone 1 and 21 |
| Certificate | Number, issuing body and schedule of conditions | In progress; not issued |
| Where it applies | Austria: The Vienna basin, Lenzing, Schwechat | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Austria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Austria market guide covers.
Machinery and equipment, vehicles, chemicals, metals, and iron and steel are leading sectors, so chemical plants, foundries and paint and coating lines add solvent and dust hazards beyond oil and gas.
OMV AG, an integrated oil, gas and petrochemical group, is Austria's largest energy business, with a turnover of about 36 billion euros in 2021, and its refining and chemicals sites are typical Zone 1 and Zone 2 workplaces.
Transport used 31.3% of energy in 2021, the largest share of any sector, and the last coal plant closed in 2020, so fuel logistics and gas networks are the main thermal energy infrastructure.
Imported oil supplied 35.4% of energy consumed in 2022 and gas 16.8%, so pipelines, storage and distribution terminals form a large share of Austria's flammable-materials infrastructure.
“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.
The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.
In Austria. At Schwechat, Baumgarten or Linz, explosion proof usually means flameproof Ex d for fixed equipment, but a handheld at a Zone 1 pump house or a Zone 21 bagging hall is different. The IS-04Z1 uses intrinsic safety, limiting energy so it can be used live in both. The Austrian classification of the area belongs to the employer.
Nothing can be bought for Austria today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.
The market guide for Austria covers Schwechat, Baumgarten an der March, Linz, Donawitz and Leoben, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Yes, as an EU member Austria applies ATEX Directive 2014/34/EU to equipment, and workplaces are zoned under Directive 1999/92/EC. Devices for Zone 1 or Zone 2 areas normally need the Ex marking, CE marking and documentation. Check the operator's list of accepted categories.
OMV AG is the largest energy business, with integrated oil, gas and petrochemical activity, so it is a major source of classified areas. Other sites include chemical plants and utility sites. Supplier approval is run by each company, so contact its procurement and safety teams.
No: ATEX 2014/34/EU, transposed by the Explosionsschutzverordnung 2015, is the whole product-side requirement and there is no separate Austrian product approval. The employer's duties sit under the VEXAT, which is where evaluation time goes. SAMS holds no ATEX certificate yet. Confirm what your site's explosion protection document needs.
Other guides for Austria, other places in Austria, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.