Governance
The city has been under the Royal Commission for Jubail and Yanbu since 2015.
Jazan City for Primary and Downstream Industries is a planned industrial city in south-west Saudi Arabia, governed by the Royal Commission for Jubail and Yanbu. It hosts Aramco's Jazan refinery, listed at 400,000 barrels a day, alongside a gasification and power complex, which creates Zone 1 areas. An Ex-proof smartphone distributor in Jazan City for Primary and Downstream Industries would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Jazan City for Primary and Downstream Industries has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Jazan City for Primary and Downstream Industries: Hydrogen production, Power generation, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jizan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The city has been under the Royal Commission for Jubail and Yanbu since 2015.
The IGCC joint venture of Saudi Aramco, Air Products and ACWA Power supplies power, steam and hydrogen to the refinery under a 25-year own-operate-transfer contract.
Jazan Port, set up in 1976 and managed by Mawani, has 12 berths, about 5 million tonnes of annual capacity and ranks third among Saudi Red Sea ports.
Saudi Arabia's Communications, Space and Technology Commission issues radio type approval; certificates are renewed every two years and European test documents are accepted.
Jazan Province in the south-west covers 11,671 square km and had about 1.4 million residents in the 2022 census, so contractors and labour are available locally.
In 2024 the city became the first Royal Commission industrial city to achieve LEED Platinum certification for its proposed plan and design.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Jazan City for Primary and Downstream Industries. Hydrogen production and syngas bring the most demanding gas groups into play, so a marking check at Jazan should look closely at the gas group. Hydrogen is generally treated as IIC, though the operator decides. The IS-04Z1 target marking is II 2 G Ex ib IIC T4, still a target.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Jazan City for Primary and Downstream Industries yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are refinery process units, gasification and syngas, hydrogen production, power generation. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Jazan City for Primary and Downstream Industries.
It is on the humid Red Sea coast in the south-west, far from the Eastern Province hubs, so freight and service visits take longer. The industrial city is newer, with refinery, gasification and power plants, so check each plant operator's own approval rules.
Possibly. The downtown area of the development is planned beside mangroves and near the Farasan Islands, and the city has pursued LEED Platinum certification for its plan. Contractors should expect environmental conditions in permits; confirm with the Royal Commission and the plant operator.
It can. Hydrogen production and syngas areas at Jazan may need a more demanding gas group than ordinary fuel areas. The operator sets the classification, so ask for the gas group on the area drawing. The IS-04Z1 target marking is IIC, but certification is still in progress and no certificate exists yet.
Other guides for Jizan, other places in Saudi Arabia, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.