Sajaa assets
SNOC operates the Sajaa assets: four producing gas fields, a hydrocarbon processing complex, two marine terminals and a subsurface gas storage field.
Sharjah's hydrocarbon work is run by Sharjah National Oil Corporation (SNOC), whose midstream operations include the Sajaa gas processing plant, export and import terminals and a pipeline network. The emirate also has the Hamriyah Free Zone and SAIF Zone, with smaller classified areas at industrial sites. An Ex-proof mobile phone distributor in Sharjah would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Sharjah has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Sharjah: Marine terminals, Port fuel handling, Gas processing plant | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Sharjah. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
SNOC operates the Sajaa assets: four producing gas fields, a hydrocarbon processing complex, two marine terminals and a subsurface gas storage field.
Hamriyah Free Zone, established in 1995, has a 14 m deep port, and Sharjah is the only emirate with ports on both the Arabian Gulf and Gulf of Oman coasts. Classified areas are spread across many small tenants.
On 1 January 2022 Sharjah's public sector adopted a four-day working week with a three-day weekend, a first in the Gulf, so timing for government approvals and meetings needs to be checked.
The Saja'a Industrial Investment Park covers 750,000 square metres as a bonded logistics area linked by a road to Emirates Road and the three seaports.
Gulftainer manages Sharjah Container Terminal, Khorfakkan Commercial Terminal and the Sharjah and Sajaa dry ports, so port and yard rules vary by terminal.
UAE handsets need federal type approval, which accepts European documents; certificates are renewed every three years and the new type approval mark applies from 2023.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Sharjah. A marking check at Sajaa or a port fuel area would compare zone, gas group and temperature class with the marking. Gas and condensate pipelines and storage may be Zone 1. The IS-04Z1 target, II 2 G Ex ib IIC T4, is in progress; SNOC and tenants set their own acceptance rules.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Sharjah yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are gas processing plant, gas and condensate pipelines and storage, marine terminals, port fuel handling. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Sharjah.
Port Khalid and Hamriyah Port on the Gulf and Khorfakkan Port on the Gulf of Oman coast. Gulftainer runs several container and dry-port facilities, so choose the port by cargo type and destination, and confirm customs and import-permit needs with your freight forwarder.
No. Type approval is federal, issued by the Telecommunications and Digital Government Regulatory Authority, so one certificate covers the UAE. Certificates are typically renewed every three years. Individual sites may add their own device rules for hazardous areas; confirm them with the operator.
Sharjah has a hot, humid climate with high summer temperatures. The IS-04Z1 has a 4,000 mAh battery and IP68 rating, but no heat limits are published here. Ask for the datasheet, and confirm with the operator whether outdoor rounds in summer are planned.
Related guides for Sharjah and for United Arab Emirates.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.