Romania: projects and investment
OMV Petrom completed an offshore campaign in the Lebăda Est and Lebăda Vest fields on the Histria block in the Black Sea in 2010, showing that offshore work is an established part of Romanian upstream activity.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for Romanian refineries, well sites, gas plants and port terminals rather than for an office. Buyers searching for an ATEX and IECEx smartphone supplier for Romania can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An ATEX and IECEx smartphone for Romania cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Romania: Borzești and Onești, Râmnicu Vâlcea, Ploiești and Brazi | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Romania. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Romania market guide.
OMV Petrom completed an offshore campaign in the Lebăda Est and Lebăda Vest fields on the Histria block in the Black Sea in 2010, showing that offshore work is an established part of Romanian upstream activity.
Petrom was privatised in late 2004 and sold to the Austrian company OMV, the largest privatisation deal in Romania's history at the time, and has been named OMV Petrom since 2010.
Gas production is around 25 million cubic metres a day, with about 100 billion cubic metres of onshore reserves and an estimated 40 billion offshore, so both Carpathian-area fields and Black Sea sites matter.
Two reactors at Cernavodă generate about 18-20% of Romanian electricity, and the country also has substantial coal deposits and considerable hydroelectric capacity, so mines, dams and power plants all feature.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Romania. A Romanian procurement or HSE reviewer, particularly at the refineries around Ploiești and Brazi, would expect ATEX evidence tied to the EU framework, with the national transposition in view. The IS-04Z1 certification programme is in progress, so no certificate exists yet. Running IECEx alongside ATEX would also help international contractors and EPCs who arrive for a shutdown with their own approval paperwork.
There is no stock to order for Romania yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Romania covers Ploiești and Brazi, Năvodari, Constanța, Vadu and Corbu, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Continental winters can bring sub-zero temperatures, which cut battery capacity and can make touchscreens harder to use with gloves. Check the lowest rated ambient temperature on the certificate and plan spare batteries and warm storage for outdoor work at pipeline stations and refineries.
Refineries, gas fields and compressor stations, Black Sea offshore fields, chemical works and power plants are the main examples. Five refineries remained by 2018 with spare capacity for export. Confirm site lists with each operator and ask for its zone drawings.
It is designed with four-constellation GNSS, 4G LTE and Wi-Fi so a lone worker at a well site or compressor station can be located and stay connected. Real coverage depends on the mobile network at the site, so test it on your own field route during an evaluation.
Other guides for Romania, other places in Romania, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.