EGAS: background
EGAS is a state-owned holding company established in August 2001 that owns and manages state stakes in gas projects, with its headquarters in Nasr City, Cairo, and it is owned by EGPC.
EGAS is Egypt's state-owned natural gas holding company, established in August 2001 and based in Nasr City, Cairo. EGAS's own timeline records the first commercial gas discovery at the Abu Madi field in 1970, household gas distribution from 1980 and the first local distribution company, Egypt Gas, in 1983. Buyers searching for an ATEX and IECEx smartphone supplier for EGAS can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An ATEX and IECEx smartphone for EGAS cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | EGAS: Tank farms, LNG and regasification facilities, Gas production and processing facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Egypt. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
EGAS publishes supplier registration forms and guides, and an LNG supplier register with published criteria, on its website (egas.com.eg); confirm current procedures with EGAS directly. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
EGAS is a state-owned holding company established in August 2001 that owns and manages state stakes in gas projects, with its headquarters in Nasr City, Cairo, and it is owned by EGPC.
BP's West Nile Delta development, announced in 2015 with a 12 billion dollar investment, processes offshore gas onshore and was expected to supply about a quarter of Egypt's gas, with the Atoll field producing from 2018.
The Zohr gas field, found in 2015 about 190 km north of Port Said, is estimated to hold around 30 trillion cubic feet of gas, and production began in December 2017.
Egypt's Damietta and Idku LNG plants, operated by Egyptian LNG and SEGAS LNG, make the country a supplier to international gas markets and are major coastal cryogenic sites.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In EGAS. An EGAS reviewer assessing a handset for gas production, a transmission station or an LNG and regasification facility would expect a certificate of conformity, schedule of conditions and marking. ATEX and IECEx evidence helps the international operators and EPCs working on Mediterranean and Nile Delta concessions. The IS-04Z1 is in certification and nothing has been issued.
There is no stock to order for EGAS yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
EGAS publishes supplier registration forms and guides, and an LNG supplier register with published criteria, on its website (egas.com.eg); confirm current procedures with EGAS directly.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Egypt's gas and oil sites range from humid Mediterranean coast and Nile Delta locations to hot, dusty desert areas. For handheld devices check dust and water ingress protection, high temperature rating and corrosion resistance, and confirm each site's own environmental requirements.
EGAS is a holding company that owns state stakes and issues licences, so day-to-day equipment purchases are normally made by the operating companies and joint ventures that run each field or plant. Identify the operator of the site and ask its procurement and HSE teams for requirements.
EGAS publishes supplier registration forms and guides, and an LNG supplier register with published criteria, on egas.com.eg. Procedures change, so confirm them with EGAS directly. The IS-04Z1 is in certification and has no certificate, which any registration must state honestly.
Other guides for EGAS, other places in Egypt, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.