PTT: projects and investment
In 2012 PTT Exploration and Production took over Cove Energy, which held an 8.5% share in a large offshore natural gas field in Mozambique, extending PTT's offshore gas work abroad.
PTT is Thailand's state-controlled national energy company, with the Ministry of Finance holding 51.1%. It runs submarine gas pipelines in the Gulf of Thailand and the gas separation plants at Map Ta Phut, and controls group companies in exploration, petrochemicals and refining. This page explains what to look for in an ATEX and IECEx smartphone for PTT, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for PTT: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | PTT: Gas separation plants, Gas pipelines and receiving facilities, LPG terminals | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Thailand. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
In 2012 PTT Exploration and Production took over Cove Energy, which held an 8.5% share in a large offshore natural gas field in Mozambique, extending PTT's offshore gas work abroad.
PTT was established on 29 December 1978 as the Petroleum Authority of Thailand, and was corporatised and re-registered as PTT Public Company Limited on 1 October 2001, listing on the Stock Exchange of Thailand that December.
The headquarters is on Vibhavadi Rangsit Road in Chatuchak, Bangkok, while its key assets are offshore in the Gulf of Thailand and at industrial sites, so site contacts are separate from head office.
PTT opened the Bangchak oil refinery in Bangkok in 1985 and built a nationwide network of fuel distribution outlets, adding refinery and retail forecourt areas to its estate.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In PTT. A PTT reviewer would expect certificate evidence that names the model and the marking for its gas separation plants, pipelines and receiving facilities. International contractors and group-company projects may carry ATEX or IECEx papers, so a dual route helps comparison. The IS-04Z1 programme is in progress and no certificate has been issued.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typical sites include offshore production platforms and gas receiving terminals, LPG terminals, refineries, petrochemical complexes and fuel stations. Zoning is facility-specific, so ask the operating subsidiary's HSE team for area classification drawings and its portable-electronics rules before specifying devices.
Because most employees and operations sit in subsidiaries such as PTT Exploration and Production or PTT Global Chemical, each often runs its own procurement and HSE approval. Identify the operating company for the site and confirm its supplier registration and certification requirements.
Not necessarily. The sheet notes that refining and petrochemicals are run by group companies, not PTT itself, and that supplier registration and equipment approval are run by the organisation. Confirm which entity applies with its procurement and HSE teams. The IS-04Z1 has no certificate yet.
Related guides for PTT and for Thailand.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.