CNOOC: industry on the ground
A 2019 national science award recognised CNOOC's exploration of a deep, large-scale condensate gas field in the Bohai Bay Basin, which is a major offshore production area.
CNOOC is a Beijing-headquartered state-owned company, established in 1982, focused on offshore oil and gas. Its listed arm, CNOOC Limited, reported record net production of 2.13 million barrels of oil equivalent per day in 2025, mainly from Bohai and the South China Sea. If you are specifying an ATEX and IECEx smartphone for CNOOC, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for CNOOC: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | CNOOC: Offshore production platforms and FPSOs, Onshore terminals, Refinery and petrochemical plants | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in China. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
A 2019 national science award recognised CNOOC's exploration of a deep, large-scale condensate gas field in the Bohai Bay Basin, which is a major offshore production area.
CNOOC is the third-largest national oil company in China, owned by the state through SASAC, with CNOOC Limited and China Oilfield Services as its listed subsidiaries.
CNOOC Gas and Power is described as China's largest LNG importer and terminal operator, so LNG receiving terminals form a major class of its cryogenic and gas hazardous areas.
CNOOC was incorporated in 1982 under State Council regulations for cooperation with foreign enterprises, and was authorised to take overall responsibility for offshore oil and gas in China.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In CNOOC. A CNOOC reviewer assessing a handset for Bohai or South China Sea platforms, onshore terminals or the Huizhou complex would look for a certificate of conformity, schedule of conditions and marking. ATEX and IECEx evidence helps international partners and EPCs working with CNOOC on offshore and petrochemical projects. The IS-04Z1 is in certification and nothing has been issued.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
China operates its own explosion-protection certification scheme, commonly marked Ex with a national certificate, in addition to international schemes. CNOOC and its contractors normally ask for the certificate accepted in China, so confirm the required marks and testing bodies before offering devices.
Yes. Offshore platforms combine confined spaces, salt air and vibration with gas and oil areas, while LNG terminals involve cryogenic liquids, large storage tanks and jetties. Ask the facility for area classification drawings, and check device ratings for each environment.
Not by itself. CNOOC runs its own supplier registration and equipment approval, and national requirements may apply. IECEx documents help comparison but do not replace them. The IS-04Z1 has no certificate yet. Confirm current requirements with CNOOC's procurement and HSE teams before planning any evaluation.
Related guides for CNOOC and for China.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.