Peru: infrastructure
The 540 kilometre Camisea pipeline crosses the steep Andes to the Pisco terminal in the Paracas National Reservation, passing the Malvinas plant where LPG liquids are separated from the gas.
The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in Peru every shift: copper mine and concentrator operators, Camisea gas-field crews, refinery engineers, and the HSE and telecoms teams who equip them. This page sets out how an ATEX and IECEx mobile phone supply route to Peru will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An ATEX and IECEx mobile phone for Peru cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Peru: Camisea, Talara, Cuajone / Toquepala | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Peru. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Peru market guide covers.
The 540 kilometre Camisea pipeline crosses the steep Andes to the Pisco terminal in the Paracas National Reservation, passing the Malvinas plant where LPG liquids are separated from the gas.
A testing partner reports that Peruvian homologation needs no local laboratory tests or local representative, certificates have unlimited validity, and there are no extra labelling requirements.
Type approval for radio equipment in Peru is run by the Ministerio de Transportes y Comunicaciones, MTC, and is based on American FCC standards.
The Camisea gas project in the Cusco Region started operating in August 2004, in a remote forested part of the Amazon Basin on the Urubamba River with a largely Indigenous population.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Peru. A Peruvian reviewer at a mine, Camisea or a refinery would expect IECEx evidence, as it is the technical basis Peruvian operators work from, with ATEX as an additional route for international contractors. INACAL conformity marking is pursued alongside. The programme is in progress, no certificate is issued, and the evidence should be requested in writing.
There is no stock to order for Peru yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Peru covers Cuajone / Toquepala, Antamina, Cerro Verde, Las Bambas, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
At altitude the air is thin and cold, with strong sun and sharp temperature swings, so check the operating temperature range, battery behaviour in cold and any altitude rating on the datasheet. Confirm site limits with the mine operator, who may also restrict where devices can be taken underground.
Yes. Camisea is a remote, forested site in the Amazon Basin, so deliveries and repairs are slow. Plan spare devices, chargers and batteries, and ask the operator or contractor about transport, camp rules, permits and device approval before dispatching equipment.
Android 16 carries both Spanish and English interface languages on the same handset, which suits operations with local and international technical staff. Interface language is a software matter and separate from certification. Check with your IT team which language packs and apps your fleet policy requires.
More on Peru, and on other places in Peru.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.