Canada: rules and approvals
Electrical products for hazardous locations must be certified by a body accredited by the Standards Council of Canada, and IECEx or ATEX certificates are not accepted in place of that certification.
The IS-04Z1 is an Ex phone for people working inside classified areas at Canadian oil sands plants, gas plants, refineries and offshore platforms. Buyers searching for an ATEX and IECEx mobile phone supplier for Canada can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An ATEX and IECEx mobile phone for Canada cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Canada: Sarnia Chemical Valley, Kitimat and the north coast, Athabasca oil sands | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Canada. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Canada market guide.
Electrical products for hazardous locations must be certified by a body accredited by the Standards Council of Canada, and IECEx or ATEX certificates are not accepted in place of that certification.
The Great Canadian Oil Sands plant, now part of Suncor, opened in 1967, and Fort McMurray's growth took off as further oil sands plants followed after the 1970s energy crises.
Zone approval in Canada uses the CAN/CSA C22.2 No. 60079 series, and an existing IECEx certificate with test reports can shorten the work, because mainly the national differences then have to be addressed.
Fort McMurray sits in the middle of the Athabasca oil sands, 435 km north-east of Edmonton on Highway 63, surrounded by boreal forest, so access is largely by one road or by air.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Canada. A Canadian reviewer expects a mark from a body accredited by the Standards Council of Canada under CSA C22.1, with the ambient range printed on it. IECEx and ATEX evidence supports international operators and contractors such as Fluor, Worley and the LNG Canada projects, but does not replace the Canadian route. All certification is in progress.
There is no stock to order for Canada yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Canada covers Athabasca oil sands, Cold Lake and the Lakeland, Alberta Industrial Heartland, Montney and Duvernay, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Devices with Wi-Fi, Bluetooth or cellular radios generally need ISED certification and must meet the applicable Radio Standards Specifications, along with interference limits such as ICES-003. A certification body recognised by ISED can issue it. Confirm the exact requirements for your device with ISED or an accredited body.
The Canadian Electrical Code now uses Zones in Section 18, while Class and Division rules remain in Annex J for existing installations, so older plants may still be classified by Division. Check the classification drawing for the area and make sure the device marking matches the system used there.
The marking target is II 2 G Ex ib IIC T4, with Class I Division 1 pursued on the same intrinsic safety basis. Nothing has been issued: certification is in progress. Canadian Section 18 classifies by Zone while Annex J18 keeps Division. Check which system your site's drawings use before anything is specified.
More on Canada, and on other places in Canada.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.