Iraq: projects and investment
BP signed a preliminary agreement to develop four Kirkuk-region fields, which it estimates hold about nine billion barrels of recoverable oil, on a profit-sharing basis.
The IS-04Z1 is an intrinsically safe smartphone designed for Zone 1 and Zone 21, built for degassing stations, gas plants, refineries and terminals where a crew is a long way from a replacement. Iraq's Communications and Media Commission issues type approval certificates valid for one year, and the application normally goes through a registered local partner. Distribution partners for Iraq are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Iraq has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Iraq: Zubair, Majnoon, Halfaya | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Iraq. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Iraq market guide.
BP signed a preliminary agreement to develop four Kirkuk-region fields, which it estimates hold about nine billion barrels of recoverable oil, on a profit-sharing basis.
In December 2024 the Iraqi Cabinet approved a Basrah to Haditha oil pipeline project valued at about 4.56 billion dollars.
Fields managed by Basra Oil Company exported about 3.23 million barrels a day from southern terminals in December 2024, nearly all of Iraq's export volume that month.
Summers from May to October are very hot and dry, with temperatures above 46 degrees Celsius, and dry dusty winds, while winters are wetter and cooler.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Iraq. An Iraqi operator or international oil-company reviewer would expect IECEx evidence plus COSQC conformity, which the sheet lists as in progress. ATEX evidence also helps contractors who work across several countries. A dual route lets one pack serve the field operator and its contractors. No certificate has been issued yet.
A distributor for Iraq would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Iraq covers Rumaila, West Qurna, Zubair, Majnoon, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Iraq.
State oil companies run their own supplier procedures through procurement and HSE teams, and international contractors on the fields have their own. Ask the end user which company's rules apply before you ship equipment.
Yes. Iraq's Communications and Media Commission issues type approval certificates, normally valid for one year, and the process uses a registered local partner. A new certificate format with a QR code was adopted in August 2026, so check current requirements.
The IS-04Z1 is designed with IP68 sealing for industrial duty, but heat affects any battery. Ask for the datasheet's operating range and test a unit on a real summer round. Site rules on charging and storage in safe areas still apply.
Other guides for Iraq, other places in Iraq, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.