Norway: background
Statoil built petrochemical processing plants at Rafnes and, with Norsk Hydro, at Mongstad in 1980, and became operator on the Gullfaks field in 1981, the first Norwegian company to do so.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, from a wet deck in the northern North Sea to a winter round on the Barents coast. This page sets out how an ATEX and IECEx cell phone supply route to Norway will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An ATEX and IECEx cell phone for Norway cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Norway: Mongstad, Øygarden, Stavanger and Sola | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Norway. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Norway market guide.
Statoil built petrochemical processing plants at Rafnes and, with Norsk Hydro, at Mongstad in 1980, and became operator on the Gullfaks field in 1981, the first Norwegian company to do so.
North Sea oil was discovered in Norwegian waters in the late 1960s, and oil and gas exports have since become a central part of the Norwegian economy, with a mature and well-developed offshore supply chain.
Mongstad in Vestland county has Norway's largest refinery at about 12 million tonnes of crude a year, a crude terminal with 9.5 million barrels of storage, and Norway's biggest port by tonnage.
Most of Norway's electricity is generated by hydroelectric plants, so dams, tunnels and power stations are a separate type of industrial site alongside oil and gas.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Norway. A Norwegian HSE or procurement reviewer on the shelf would expect ATEX evidence, with IECEx alongside for international operators and contractors. Evidence should be precise enough to drop into the operator's documentation. A dual route helps firms such as Aibel and international partners moving between Norwegian and overseas work. Both programmes are running and no certificate is issued.
There is no stock to order for Norway yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Norway covers Stavanger and Sola, Bergen and Flesland, Kårstø, Kollsnes, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Winters are cold and offshore conditions are wet, windy and salt-laden, so check the lowest rated ambient temperature, the water ingress rating and touch operation with gloves. Cold reduces battery capacity, so spare batteries and warm storage are typically recommended.
Stavanger is the headquarters of Equinor and a hub for offshore supply, while processing plants such as Mongstad and Rafnes were built by Statoil and Norsk Hydro. Gas terminals and refineries are along the west coast. Confirm current operations with the operator.
Android 16 with EMM and MDM is designed so a device can be wiped, re-enrolled and reissued to the incoming crew, including from the beach before the helicopter. Your own telecoms policy decides how that is done, so agree the process with your IT team before deployment.
More on Norway, and on other places in Norway.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.