Austria: infrastructure
More than 3,000 hydro plants provided 54% of installed generating capacity in 2021, and Verbund generates about 90% of its power from hydro, so dam and turbine-hall work dominates the electricity side.
The IS-04Z1 is an ex proof phone designed to ATEX 2014/34/EU for gas and dust atmospheres, built for refinery turnarounds, gas stations on the transit grid, steel works and fibre plants. Transport used 31.3% of energy in 2021, the largest share of any sector, and the last coal plant closed in 2020, so fuel logistics and gas networks are the main thermal energy infrastructure. An ATEX and IECEx cell phone distributor in Austria would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Austria has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Austria: Linz, Donawitz and Leoben, The Vienna basin | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Austria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Austria market guide covers.
More than 3,000 hydro plants provided 54% of installed generating capacity in 2021, and Verbund generates about 90% of its power from hydro, so dam and turbine-hall work dominates the electricity side.
OMV opened the Schwechat refinery near Vienna in 1960, and since 1970 the Adria-Vienna Pipeline has delivered crude from the marine terminal at Trieste, Italy, to Schwechat.
Borealis, headquartered in Vienna, is Europe's second-largest polyolefins producer and a major petrochemicals company, with plants in Austria, Germany, Belgium, Finland and Sweden.
Machinery and equipment, vehicles, chemicals, metals, and iron and steel are leading sectors, so chemical plants, foundries and paint and coating lines add solvent and dust hazards beyond oil and gas.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Austria. On the product side Austria is short: ATEX 2014/34/EU, transposed by the Explosionsschutzverordnung 2015, is the whole requirement. A reviewer would ask for the notified body certificate, the EU declaration of conformity and CE marking, in German. An IECEx route alongside helps groups that also operate outside the EU. The certification programme is in progress.
A distributor for Austria would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Austria covers Schwechat, Baumgarten an der March, Linz, Donawitz and Leoben, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Austria.
Chemical production, metalworking, paint and coating, food processing with dust, sewage treatment and energy supply all feature in Austria's industrial mix. Each employer must assess and zone its own workplace, so ask for the explosion protection document before bringing in new devices.
German is the working language, and ATEX instructions are typically expected in the language of the destination country. A German-language manual and certificate pack typically makes site acceptance easier. Ask the operator whether English documentation is also acceptable on its premises.
Austrian acceptance treats German documentation as a condition, so the manual, safe-use instructions and declaration of conformity are planned in German alongside English, with a German interface on Android 16. The certification programme is in progress and nothing has been issued. Check the exact requirement with your safety officer.
More on Austria, and on other places in Austria.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.