SOCAR: projects and investment
SOCAR has explored the Umid and Bulla Deniz gas fields and signed a 2014 agreement for the shallow-water Absheron Peninsula area, so offshore gas development continues near Baku.
SOCAR is Azerbaijan's fully state-owned oil and gas company, founded in 1992 and based in Baku. The Sangachal Terminal, about 45 km south of Baku, receives hydrocarbons from the Azeri-Chirag-Gunashli and Shah Deniz fields and feeds the export pipelines to Turkey and Europe. Buyers searching for an intrinsically safe smartphone supplier for SOCAR can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe smartphone for SOCAR cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | SOCAR: Petrochemical plants, Gas processing, Offshore production platforms | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Azerbaijan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
SOCAR's website has a dedicated procurement section covering procurement notices, standards and pre-qualification requirements; suppliers follow the process published there. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
SOCAR has explored the Umid and Bulla Deniz gas fields and signed a 2014 agreement for the shallow-water Absheron Peninsula area, so offshore gas development continues near Baku.
SOCAR was created on 13 September 1992 by merging Azerineft State Concern and the Azerneftkimiya Production Association, and it is headquartered in Baku as a fully state-owned company.
Azerbaijan has 57 oil fields, 18 of them offshore in the Azerbaijani sector of the Caspian Sea, and much of SOCAR's revenue comes from the Azeri-Chirag-Gunashli complex and the Shah Deniz gas field.
SOCAR operates two oil refineries, including the Heydar Aliyev Baku Oil Refinery, and one gas processing plant; the Azerneftyagh refinery processes 21 of the 24 grades of Azerbaijani crude.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In SOCAR. Turnarounds and daily rounds at refinery process units, petrochemical plants and gas processing areas call for photographing, tag reading and permit paperwork in the field. A handheld designed as intrinsically safe could carry that on one device. The IS-04Z1 is designed for such work, with certification still in progress.
Nothing can be bought for SOCAR today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
SOCAR's website has a dedicated procurement section covering procurement notices, standards and pre-qualification requirements; suppliers follow the process published there.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Typical uses include offshore platforms in the Caspian, the Sangachal Terminal, the Baku and Azerneftyagh refineries, the gas processing plant and oil terminals. Zone classification is site-specific, so ask each facility for its area drawings and its portable-electronics policy before specifying devices.
Caspian platforms combine salt-laden or humid air, wind and limited space with Zone 1 and Zone 2 areas, and winter weather can cut logistics. For handheld devices check ingress protection, corrosion resistance and battery behaviour, and confirm environmental limits with the platform operator.
SOCAR's website has a procurement section covering notices, standards and pre-qualification requirements, and suppliers follow the published process. Requirements change, so confirm them with SOCAR directly. The IS-04Z1 is in certification and no certificate has been issued, which a pre-qualification file would need to state honestly.
Related guides for SOCAR and for Azerbaijan.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.