Azerbaijan: industry on the ground
The terminal has processing capacity of 1.2 million barrels of oil and 1.25 billion cubic feet of gas a day, with storage of about 3 million barrels, so tank farms and process trains are large.
A Zone 1 / Zone 21 smartphone for crews on the Caspian platforms, the Sangachal terminal, the Baku refinery and the petrochemical plants at Sumgait. The terminal is operated by a BP-led consortium and receives oil from the Azeri-Chirag-Guneshli field and gas from Shah Deniz. Distribution partners for Azerbaijan are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Azerbaijan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Azerbaijan: Baku, Sumgait Chemical Industrial Park, Absheron peninsula | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Azerbaijan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Azerbaijan market guide.
The terminal has processing capacity of 1.2 million barrels of oil and 1.25 billion cubic feet of gas a day, with storage of about 3 million barrels, so tank farms and process trains are large.
The Sangachal Terminal Expansion Program started in November 2001 with a budget of 1.2 to 2 billion US dollars and included accommodation for about 550 people on site.
Construction began in 1996 with the Early Oil Project and oil was first exported in October 1997, after which ACG oil trains, a BTC pumping station and the Shah Deniz gas plant were added.
Sangachal Terminal is on the Caspian coast 45 kilometres south of Baku and covers about 500 hectares, forming the main shore base for the offshore fields.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Azerbaijan. Platform and terminal rounds involve stairs, ladders, wet decks and crew transfers, with no safe socket mid shift. An intrinsically safe handheld is designed to be used on those rounds as it is, for photographs, tag scans and readings between structures at Sangachal, with a 4,000 mAh battery sized for a working day.
A distributor for Azerbaijan would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
The market guide for Azerbaijan covers Sangachal terminal, ACG and Shah Deniz, offshore, Baku, Sumgait Chemical Industrial Park, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Azerbaijan.
The BP-led operating consortium sets site HSE, permit and equipment rules, applying its own standards on top of national requirements. Contractors normally follow the operator's induction and approved-equipment procedures, so ask the operator's HSE team which certificates and registers apply.
A compliance agent describes type approval from the national telecom authority as mandatory for products with wireless components, with an average lead time of about three weeks and no label or sample requirement. Treat this as a guide and confirm current rules with the ministry or a local agent.
Android 16 offers Azerbaijani, Russian and English language settings, and documentation in those three languages is expected on site. Whether a given operator requires one of them specifically is a procurement question. Ask the operator or the locally registered supply partner before the evaluation, so the documentation set matches what site safety teams will request.
Other guides for Azerbaijan, other places in Azerbaijan, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.