Ireland: infrastructure
Moneypoint on the Shannon estuary, commissioned 1985-1987 and Ireland's largest power station at 915 MW, stopped burning coal in June 2025 and is due to run as a heavy-oil back-up plant until 2029.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, aimed at the solvent suites and powder rooms of the Irish pharmaceutical cluster, and at the refinery, gas terminal and alumina plant that make up the rest. This page sets out how an industrial smartphone supply route to Ireland will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An industrial smartphone for Ireland cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Ireland: Grange Castle and Clondalkin, Bellanaboy, Ringaskiddy | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Ireland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Ireland market guide covers.
Moneypoint on the Shannon estuary, commissioned 1985-1987 and Ireland's largest power station at 915 MW, stopped burning coal in June 2025 and is due to run as a heavy-oil back-up plant until 2029.
Vermilion Energy became operator of the Corrib project in 2018 and the majority owner in 2021, so contractor induction and device approval at Bellanaboy follow that operator's procedures.
Directive 2014/34/EU replaced the earlier 94/9/EC equipment directive and became mandatory for manufacturers on 20 April 2016, so older Ex devices may carry earlier markings.
The Corrib field was discovered in 1996 and was the first reported commercial gas discovery in Ireland since the Kinsale Head field in 1971, which shows how few upstream gas sites exist.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Ireland. Irish plants run many contractors alongside site staff, so EMM or MDM enrolment helps provision devices by project. The IS-04Z1 is designed for managed deployment. Pharmaceutical sites often have strict IT and data policy, so connectivity, charging in safe areas and device approval should be agreed with the site team.
Nothing can be bought for Ireland today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Ireland covers Ringaskiddy, Whitegate, Little Island and Carrigaline, Shannon Estuary, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
The Corrib gas field off County Mayo, with its onshore processing plant at Bellanaboy, is Ireland's only domestic gas production source. Other hazardous areas include fuel terminals, power stations and chemical or pharmaceutical plants. Request the operator's zone drawings before planning device use.
The project operator, currently Vermilion Energy, sets contractor and equipment requirements for the Corrib onshore plant, normally through its HSE team. Contact the site HSE office for the current induction, device registration and certificate requirements before travelling.
That depends on the zone, gas group and the site's rules. The device would need a marking suited to the classified room, and the site may add its own IT, cleaning and data rules. Ask the site's HSE team to review the evidence before bringing any device in.
More on Ireland, and on other places in Ireland.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.