Ireland: infrastructure
Moneypoint on the Shannon estuary, commissioned 1985-1987 and Ireland's largest power station at 915 MW, stopped burning coal in June 2025 and is due to run as a heavy-oil back-up plant until 2029.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, aimed at the solvent suites and powder rooms of the Irish pharmaceutical cluster, and at the refinery, gas terminal and alumina plant that make up the rest. This page sets out how an industrial mobile phone supply route to Ireland will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An industrial mobile phone for Ireland cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Ireland: Grange Castle and Clondalkin, Bellanaboy, Ringaskiddy | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Ireland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Ireland market guide.
Moneypoint on the Shannon estuary, commissioned 1985-1987 and Ireland's largest power station at 915 MW, stopped burning coal in June 2025 and is due to run as a heavy-oil back-up plant until 2029.
Vermilion Energy became operator of the Corrib project in 2018 and the majority owner in 2021, so contractor induction and device approval at Bellanaboy follow that operator's procedures.
Directive 2014/34/EU replaced the earlier 94/9/EC equipment directive and became mandatory for manufacturers on 20 April 2016, so older Ex devices may carry earlier markings.
The Corrib field was discovered in 1996 and was the first reported commercial gas discovery in Ireland since the Kinsale Head field in 1971, which shows how few upstream gas sites exist.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Ireland. Irish plants run many contractors alongside site staff, so EMM or MDM enrolment helps provision devices by project. The IS-04Z1 is designed for managed deployment. Pharmaceutical sites often have strict IT and data policy, so connectivity, charging in safe areas and device approval should be agreed with the site team.
Supply of the IS-04Z1 to Ireland starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Ireland covers Ringaskiddy, Whitegate, Little Island and Carrigaline, Shannon Estuary, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
The Corrib gas field off County Mayo, with its onshore processing plant at Bellanaboy, is Ireland's only domestic gas production source. Other hazardous areas include fuel terminals, power stations and chemical or pharmaceutical plants. Request the operator's zone drawings before planning device use.
The project operator, currently Vermilion Energy, sets contractor and equipment requirements for the Corrib onshore plant, normally through its HSE team. Contact the site HSE office for the current induction, device registration and certificate requirements before travelling.
That depends on the zone, gas group and the site's rules. The device would need a marking suited to the classified room, and the site may add its own IT, cleaning and data rules. Ask the site's HSE team to review the evidence before bringing any device in.
Related guides for Ireland and for Ireland.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.