Island logistics
The city sits on an island in the Laguna de Terminos, linked to the mainland by the 3.9 km Zacatal Bridge.
Ciudad del Carmen is a port city on Isla del Carmen in Campeche, and the main shore base for offshore oil activity in the Sonda de Campeche. Pemex's exploration of the Campeche Basin in the early 1970s led to the Cantarell field, about 70 km from Ciudad del Carmen, which supplied 63.2 per cent of Mexico's crude at its 2004 peak before declining. An industrial mobile phone distributor in Ciudad del Carmen would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Ciudad del Carmen has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Ciudad del Carmen: Marine terminal and storage, Offshore production platforms, Supply-vessel and crew-change bases | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Ciudad del Carmen. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The city sits on an island in the Laguna de Terminos, linked to the mainland by the 3.9 km Zacatal Bridge.
There is a dry season from January to May and heavy rain later in the year; Gulf hurricane season can disrupt crew changes and sea transport.
The city had about 7,000 people in 1840, and the Carmen municipality had 221,094 at the 2010 census, second only to the state capital municipality in Campeche.
Arrival of specialised oil staff doubled the Carmen municipality's population between 1970 and 1980 to 144,684, and the city moved from a shrimping economy, begun in the 1940s, to one that relies on oil.
The Universidad Autonoma del Carmen (UNACAR) is the main university in Ciudad del Carmen, providing a local base of technical graduates for port and marine activity.
The Puente del Zacatal, built in 1994, is one of the longest bridges in Latin America and is a key road link for the island city.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Ciudad del Carmen. Fleets here include Pemex staff and offshore service contractors on rotations, so crews and devices move between shore and sea. EMM and MDM support lets an administrator enrol and manage devices centrally. Charging must be done in safe areas such as the base or accommodation, and offshore connectivity should be checked ahead of time.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Ciudad del Carmen yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are marine terminal and storage, offshore production platforms, supply-vessel and crew-change bases. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Ciudad del Carmen.
Typically yes: heat, humidity and salt air are the main concerns, so sealed, corrosion-resistant devices are sensible. Confirm operator guidance on ingress protection and temperature class.
Mexico has its own conformity framework, and operators often also accept IECEx or ATEX marking. Requirements change, so confirm with the operator and a local certification adviser before shipping.
Only if its marking suits the zone and gas group at each location, as classified by the operator. Offshore platforms and onshore terminals may differ. Check each area's classification and the certificate conditions before moving a device between them.
Related guides for Ciudad del Carmen and for Mexico.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.