Ireland: geography and layout
The Corrib gas field lies about 83 km off the north-west coast of County Mayo and is Ireland's only domestic source of natural gas, so the Mayo coast is the country's main upstream gas location.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, aimed at the solvent suites and powder rooms of the Irish pharmaceutical cluster, and at the refinery, gas terminal and alumina plant that make up the rest. Irving Oil runs Ireland's only oil refinery, at Whitegate in County Cork. Distribution partners for Ireland are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Ireland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Ireland: Little Island and Carrigaline, Shannon Estuary, Grange Castle and Clondalkin | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Ireland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Ireland market guide covers.
The Corrib gas field lies about 83 km off the north-west coast of County Mayo and is Ireland's only domestic source of natural gas, so the Mayo coast is the country's main upstream gas location.
Moneypoint on the Shannon estuary, commissioned 1985-1987 and Ireland's largest power station at 915 MW, stopped burning coal in June 2025 and is due to run as a heavy-oil back-up plant until 2029.
Vermilion Energy became operator of the Corrib project in 2018 and the majority owner in 2021, so contractor induction and device approval at Bellanaboy follow that operator's procedures.
Directive 2014/34/EU replaced the earlier 94/9/EC equipment directive and became mandatory for manufacturers on 20 April 2016, so older Ex devices may carry earlier markings.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Ireland. Irish plants run many contractors alongside site staff, so EMM or MDM enrolment helps provision devices by project. The IS-04Z1 is designed for managed deployment. Pharmaceutical sites often have strict IT and data policy, so connectivity, charging in safe areas and device approval should be agreed with the site team.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Ireland. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Ireland covers Ringaskiddy, Whitegate, Little Island and Carrigaline, Shannon Estuary, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Ireland.
Atlantic coastal sites are often wet, windy and salt-laden, which stresses seals and charging contacts. Check the water ingress rating, the lowest ambient temperature on the certificate and whether the touchscreen works with wet gloves. Spare batteries are worthwhile for long outdoor shifts.
Ireland is an EU member, so ATEX Directive 2014/34/EU applies to equipment and Directive 1999/92/EC to workplace zoning. Zone 1 and Zone 2 devices should carry CE and Ex markings. Individual plants typically add their own permit-to-work and equipment registration processes.
ATEX is the usual reference in the EU and is applied in Ireland through national regulations. Multinational sites may also ask for IECEx. Ask the operator which evidence it requires, and check the certification status, as the IS-04Z1 certification programme is still in progress.
Other guides for Ireland, other places in Ireland, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.