Sonatrach: geography and layout
It operates Hassi Messaoud, Algeria's largest oil field, and the Hassi R'Mel field south of Algiers, plus other fields such as Tin Fouye Tabankort, Zarzaitine and Haoud Berkaoui, mostly in the Saharan interior.
In February 2022 Sonatrach signed a contract to build a 150,000 cubic metre LNG storage tank at the Skikda gas export terminal, adding a new cryogenic storage area to the coastal complex. It covers exploration and production, pipeline transport, liquefaction and separation, refining and petrochemicals, and marketing, through more than 150 subsidiaries and affiliates. If you are specifying an IECEx smartphone for Sonatrach, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Sonatrach: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Sonatrach: Pipeline terminals, Oil and gas production facilities, Gas processing | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Algeria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
It operates Hassi Messaoud, Algeria's largest oil field, and the Hassi R'Mel field south of Algiers, plus other fields such as Tin Fouye Tabankort, Zarzaitine and Haoud Berkaoui, mostly in the Saharan interior.
Around 2002 Sonatrach was reported to employ roughly 120,000 workers and produce about 30% of Algeria's national output, so it is by far the dominant industrial employer.
A 10 MWp photovoltaic plant was announced in November 2021 in the Hassi Berkine basin to supply oil sites in the region, an indication of how remote and sun-exposed the Saharan fields are.
The Hassi R'Mel to Skikda and El Kala gas pipeline is 48 inches in diameter and links the Hassi R'Mel gas field to the Skikda export area on the Mediterranean coast.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Sonatrach. Sonatrach works with international contractors across its fields, plants and terminals, and visiting teams often carry equipment already assessed under the IECEx scheme. A certificate of conformity and its schedule of conditions let those teams and Sonatrach reviewers compare one device against the same marking and limits. The IS-04Z1 is targeted at IECEx, but nothing has been issued yet.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typical Zone 1 and Zone 2 areas are found at wellheads, gas treatment and compression plants at Hassi Messaoud and Hassi R'Mel, pipeline stations, and the LNG and liquids terminals at Arzew and Skikda. Classification is site-specific, so ask the facility for area drawings before choosing devices.
Sonatrach and its subsidiaries manage their own procurement, typically through registration, tenders and technical evaluation, and joint ventures with international partners may add their own requirements. There is no public approved list, so confirm the current route with the relevant Sonatrach entity.
Ask for the certificate, schedule of conditions and marking, and compare them with the zone and gas group in the site's classification documents. Contractor induction and permit rules also apply. The IS-04Z1 is still in certification, so confirm current requirements with Sonatrach's procurement and HSE teams before any evaluation unit is taken on site.
More on Sonatrach, and on other places in Algeria.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.