Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Chile · IECEx

IECEx Mobile Phone Supplier in Chile

The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in Chile every shift: copper and lithium plant operators in the Atacama, refinery crews at Concón, and the HSE and telecoms teams who equip them. Buyers searching for an IECEx mobile phone supplier for Chile can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Chile, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicIECEx
DeviceMobile Phone
RouteSupply
WhereChile

Short answer. An IECEx mobile phone for Chile cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · IECEx

Checklist: IECEx mobile phone for Chile

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
Certificate of conformityNumber checkable on the IECEx online registerIn progress; not issued
Standards editionThe IEC 60079 edition the certificate citesStated on the certificate when issued
Schedule of conditionsLimits of use, batteries and accessoriesPublished with the certificate
Where it appliesChile: Concón, Magallanes, Chuquicamata / CalamaClassified by the site operator
Product · Chile

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Chile. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Chile

Hazardous-area industry in Chile

The main operators, industrial areas and sites that the SAMS Chile market guide covers.

Operators, EPCs and contractors

Codelco
State copper miner — Chuquicamata, El Teniente and other major divisions
BHP / Minera Escondida
Operator of Escondida, the world’s largest copper mine
SQM
Sociedad Química y Minera — lithium and potassium extraction on the Atacama salt flats
Antofagasta Minerals
Major private copper mining group
Collahuasi
Anglo American and Glencore joint-venture copper mine
ENAP
Empresa Nacional del Petróleo — state refining at Concón and Biobío, and Magallanes gas production

Industrial areas and sites

Chuquicamata / Calama
Codelco’s giant open-pit copper mine and smelting operations
Escondida
Concentrator and processing complex in the Atacama highlands
Salar de Atacama
Lithium and potassium brine extraction ponds
Collahuasi
High-altitude copper mine near the Bolivian border
Concón
ENAP refinery on the central coast near Viña del Mar
Magallanes
Southern gas production region near Punta Arenas
Field notes · Chile

More about Chile that matters for portable equipment

Chile: industry on the ground

In 2025 Chile was the world's largest producer of copper, iodine and rhenium, and the third-largest producer of lithium and molybdenum.

Chile: rules and approvals

Mining is governed by separate bodies including the Chilean Copper Commission, ENAMI, SERNAGEOMIN and the Ministry of Mining, so a mine's safety rules come from the mining regulator as well as electrical law.

Chile: rules and approvals

SUBTEL approves radio and telecom devices in Chile, including mobile phones, and approval is needed before importation and sale of any product using radio, Wi-Fi, Bluetooth or telecom networks.

Chile: geography and layout

Mining is concentrated in 14 districts in the northern half of the country, especially the Norte Grande region spanning most of the Atacama Desert, so many sites are arid and remote.

The term · IECEx

What “IECEx” means for a smartphone

IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.

The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.

In Chile. IECEx is the technical basis Chilean operators use, which suits the mix of Codelco, BHP, SQM, Albemarle, Antofagasta Minerals and Collahuasi, all with international contractors. The reviewer reads the certificate of conformity and the schedule of conditions. SEC conformity and Subtel radio approval are separate steps, and none of the three is finished.

The route · supply

Sourcing the IS-04Z1 for Chile

Nothing can be bought for Chile today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · Chile

Frequently asked questions

Can we buy an IECEx mobile phone in Chile today?

No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.

What does an IECEx mobile phone in Chile cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

Does the IS-04Z1 hold an IECEx certificate?

No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.

Which sites in Chile does this cover?

The market guide for Chile covers Chuquicamata / Calama, Escondida, Salar de Atacama, Collahuasi, among others. Site-level pages are linked below.

How will SAMS supply Chile?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

How should devices cope with Atacama Desert conditions?

Northern mining districts are arid, with strong sun, large day-night temperature swings and fine dust, and many sites are at altitude. Check the operating temperature range, dust ingress rating and battery performance, and confirm any altitude or site-specific limits with the operator.

Do Chilean mines have their own safety regulator?

Yes. SERNAGEOMIN is the national geology and mining service, and it works alongside the Ministry of Mining and other bodies. Mining sites therefore follow mining safety rules in addition to electrical requirements, so ask the mine's compliance team which rules apply to portable devices underground and on the surface.

Is SEC clearance enough to use the phone at Codelco or Escondida?

No: Codelco and the major private miners each run vendor-registration and engineering-approval processes, so a device can be SEC-cleared yet unlisted on an operator's equipment register. SEC and Subtel approvals are being pursued and are not finished. Confirm the registration route with the operator before purchase.

Enquiry · Chile

Ask about the IS-04Z1 for Chile

Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.

Enquiry · Chile

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Chile?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.