Azerbaijan: industry on the ground
The terminal has processing capacity of 1.2 million barrels of oil and 1.25 billion cubic feet of gas a day, with storage of about 3 million barrels, so tank farms and process trains are large.
A Zone 1 / Zone 21 smartphone for crews on the Caspian platforms, the Sangachal terminal, the Baku refinery and the petrochemical plants at Sumgait. Construction began in 1996 with the Early Oil Project and oil was first exported in October 1997, after which ACG oil trains, a BTC pumping station and the Shah Deniz gas plant were added. An IECEx cell phone distributor in Azerbaijan would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Azerbaijan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Azerbaijan: Baku, Sumgait Chemical Industrial Park, Absheron peninsula | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Azerbaijan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Azerbaijan market guide covers.
The terminal has processing capacity of 1.2 million barrels of oil and 1.25 billion cubic feet of gas a day, with storage of about 3 million barrels, so tank farms and process trains are large.
The Sangachal Terminal Expansion Program started in November 2001 with a budget of 1.2 to 2 billion US dollars and included accommodation for about 550 people on site.
Sangachal Terminal is on the Caspian coast 45 kilometres south of Baku and covers about 500 hectares, forming the main shore base for the offshore fields.
The terminal is operated by a BP-led consortium and receives oil from the Azeri-Chirag-Guneshli field and gas from Shah Deniz.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Azerbaijan. IECEx is the scheme that bridges SOCAR with international operators such as bp and TotalEnergies and with the marine and fabrication contractors on the Caspian fields. The reviewer reads the certificate of conformity for the marking and the schedule of conditions for any limits on use at the terminal, platform or Sumgait plants. SAMS holds no certificate yet.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Azerbaijan. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Azerbaijan covers Sangachal terminal, ACG and Shah Deniz, offshore, Baku, Sumgait Chemical Industrial Park, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Azerbaijan.
The BP-led operating consortium sets site HSE, permit and equipment rules, applying its own standards on top of national requirements. Contractors normally follow the operator's induction and approved-equipment procedures, so ask the operator's HSE team which certificates and registers apply.
A compliance agent describes type approval from the national telecom authority as mandatory for products with wireless components, with an average lead time of about three weeks and no label or sample requirement. Treat this as a guide and confirm current rules with the ministry or a local agent.
Android 16 offers Azerbaijani, Russian and English language settings, and documentation in those three languages is expected on site. Whether a given operator requires one of them specifically is a procurement question. Ask the operator or the locally registered supply partner before the evaluation, so the documentation set matches what site safety teams will request.
Other guides for Azerbaijan, other places in Azerbaijan, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.