Chile: industry on the ground
In 2025 Chile was the world's largest producer of copper, iodine and rhenium, and the third-largest producer of lithium and molybdenum.
The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in Chile every shift: copper and lithium plant operators in the Atacama, refinery crews at Concón, and the HSE and telecoms teams who equip them. Buyers searching for a hazardous area mobile phone supplier for Chile can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. A hazardous area mobile phone for Chile cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Chile: Concón, Magallanes, Chuquicamata / Calama | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Chile. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Chile market guide.
In 2025 Chile was the world's largest producer of copper, iodine and rhenium, and the third-largest producer of lithium and molybdenum.
Mining is governed by separate bodies including the Chilean Copper Commission, ENAMI, SERNAGEOMIN and the Ministry of Mining, so a mine's safety rules come from the mining regulator as well as electrical law.
SUBTEL approves radio and telecom devices in Chile, including mobile phones, and approval is needed before importation and sale of any product using radio, Wi-Fi, Bluetooth or telecom networks.
Mining is concentrated in 14 districts in the northern half of the country, especially the Norte Grande region spanning most of the Atacama Desert, so many sites are arid and remote.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Chile. Chile's classified areas are concentrated in the Atacama copper and lithium belt, including Chuquicamata, Escondida, Collahuasi and the Salar de Atacama, with a refining and gas cluster at Concón and Magallanes. Dust, not gas, dominates the north. Operators such as Codelco and ENAP classify their own areas, not SAMS.
Nothing can be bought for Chile today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
The market guide for Chile covers Chuquicamata / Calama, Escondida, Salar de Atacama, Collahuasi, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Northern mining districts are arid, with strong sun, large day-night temperature swings and fine dust, and many sites are at altitude. Check the operating temperature range, dust ingress rating and battery performance, and confirm any altitude or site-specific limits with the operator.
Yes. SERNAGEOMIN is the national geology and mining service, and it works alongside the Ministry of Mining and other bodies. Mining sites therefore follow mining safety rules in addition to electrical requirements, so ask the mine's compliance team which rules apply to portable devices underground and on the surface.
No: Codelco and the major private miners each run vendor-registration and engineering-approval processes, so a device can be SEC-cleared yet unlisted on an operator's equipment register. SEC and Subtel approvals are being pursued and are not finished. Confirm the registration route with the operator before purchase.
More on Chile, and on other places in Chile.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.