Pakistan: industry on the ground
Five main refineries have a combined capacity of about 450,000 barrels a day, producing diesel, motor gasoline, furnace oil, jet fuel, kerosene, LPG and naphtha, so product storage and loading areas are widespread.
A Zone 1 / Zone 21 smartphone for crews on the gas fields of Sindh and Balochistan, the refineries at Karachi, Attock and Mahmood Kot, the LNG terminals at Port Qasim and the fertiliser plants. Oil production was confined to Punjab until 1981, when a company found the first field in Lower Sindh; by 1998-99 the Lower Sindh gas fields produced more oil than Punjab. A hazardous area cell phone distributor in Pakistan would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Pakistan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Pakistan: Port Qasim, Karachi, Korangi, Karachi, Hub, Balochistan | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Pakistan market guide.
Five main refineries have a combined capacity of about 450,000 barrels a day, producing diesel, motor gasoline, furnace oil, jet fuel, kerosene, LPG and naphtha, so product storage and loading areas are widespread.
The Thar coalfield in Sindh covers over 9,000 square kilometres and holds an estimated 200 billion tonnes of lignite; the Sindh Engro Coal Mining Company is the principal mining operator there.
The Toot oil field in Punjab, about 135 km south-west of Islamabad, saw its first well in 1964 and commercial production from 1967, showing that upstream work also happens in the inland north.
Domestic refining typically meets about 60% of Pakistan's diesel, 30% of motor gasoline and all jet fuel demand, so the rest arrives as imports through port terminals.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Pakistan. Pakistan's classified work follows its gas: fields at Sui, Daharki and in Khyber Pakhtunkhwa, transmission networks of SNGPL and SSGC, LNG at Port Qasim, refineries at Korangi, Hub, Mahmood Kot and Morgah, and fertiliser plants. Each operator classifies its own areas; SAMS does not.
A distributor for Pakistan would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
The market guide for Pakistan covers Sui, Balochistan, Daharki and Ghotki, Sindh, Port Qasim, Karachi, Korangi, Karachi, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Pakistan.
Examples include the Sui gas area in Balochistan, the Toot field in Punjab, Lower Sindh gas fields and the five main refineries. Which areas are classified, and to what zone, is decided by each operator, so ask for its hazardous-area drawings.
Operators commonly ask for recognised international certification such as IECEx or ATEX against IEC 60079, but acceptance is set site by site. Request the operator's equipment approval procedure and provide certificates, marking details and manufacturer instructions with your submission.
Coverage depends on the carrier, not the handset. The device is designed to fall back to plant Wi-Fi where the signal is thin, but that depends on the site's network. Confirm with the field operator what connectivity is available before relying on it for work orders.
Other guides for Pakistan, other places in Pakistan, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.