Pakistan: industry on the ground
Oil production was confined to Punjab until 1981, when a company found the first field in Lower Sindh; by 1998-99 the Lower Sindh gas fields produced more oil than Punjab.
A Zone 1 / Zone 21 smartphone for crews on the gas fields of Sindh and Balochistan, the refineries at Karachi, Attock and Mahmood Kot, the LNG terminals at Port Qasim and the fertiliser plants. Five main refineries have a combined capacity of about 450,000 barrels a day, producing diesel, motor gasoline, furnace oil, jet fuel, kerosene, LPG and naphtha, so product storage and loading areas are widespread. Distribution partners for Pakistan are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Pakistan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Pakistan: Port Qasim, Karachi, Korangi, Karachi, Hub, Balochistan | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Pakistan market guide covers.
Oil production was confined to Punjab until 1981, when a company found the first field in Lower Sindh; by 1998-99 the Lower Sindh gas fields produced more oil than Punjab.
Domestic refining typically meets about 60% of Pakistan's diesel, 30% of motor gasoline and all jet fuel demand, so the rest arrives as imports through port terminals.
The Pakistan Telecommunication Authority, headquartered in Islamabad, regulates telecom systems and radio spectrum under the 1996 Telecommunication (Re-organization) Act, with zonal offices in Karachi, Lahore, Gwadar, Quetta, Peshawar and other cities.
Pakistan's first gas field was found near Sui in Balochistan in 1952, and the Sui area remains a name associated with the country's gas supply and upstream classified-area work.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Pakistan. A marking check in Pakistan compares II 2 G Ex ib IIC T4 with the area classification. Natural gas, LNG and refinery service is mostly Group IIA, with IIB on some process units, so an IIC marking target covers those. Fertiliser plants at Daharki and Mirpur Mathelo add dust questions, and the certified ambient range must be checked against site maximum.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Pakistan yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
The market guide for Pakistan covers Sui, Balochistan, Daharki and Ghotki, Sindh, Port Qasim, Karachi, Korangi, Karachi, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Pakistan.
Allow for import clearance, courier or freight time and any PTA rules for radio-equipped devices, then keep spare batteries and chargers on site. Large refineries typically run contractor induction before work, so agree device approval at the start of planning.
The Pakistan Telecommunication Authority, set up in 1996, regulates telecom systems and spectrum, with zonal offices in cities including Karachi, Lahore and Quetta. Device import and approval rules change over time, so check current PTA requirements with your importer before shipping.
Summer ambients there can pass 45 degrees. The certified ambient range is stated on the certificate and will be published when issued, so check it against your site maximum before planning summer use. IP68 and a rugged build help with dust but do not extend the certified range.
Other guides for Pakistan, other places in Pakistan, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.