Refining
Phillips 66's Lake Charles refinery at Westlake was built in 1941, covers 690 acres and has a crude throughput of 264,000 barrels a day. CITGO is also listed as a major employer in the Lake Charles area.
Lake Charles lies on the Calcasieu Ship Channel in south-west Louisiana and combines refining, chemicals and LNG export. Zone 1 and Zone 21 areas arise at refinery process units, chemical plants and liquefaction trains in and around the city. This page explains what to look for in an ATEX and IECEx smartphone for Lake Charles, Louisiana, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Lake Charles, Louisiana: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Lake Charles, Louisiana: Refinery process units, Chemical plant units, LNG liquefaction trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Lake Charles Louisiana. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Phillips 66's Lake Charles refinery at Westlake was built in 1941, covers 690 acres and has a crude throughput of 264,000 barrels a day. CITGO is also listed as a major employer in the Lake Charles area.
Cameron LNG at Hackberry has three trains of about 12 mtpa and reached full commercial operations in August 2020. Venture Global's Calcasieu Pass (10 mtpa nameplate, Cameron Parish) began commercial operations on 16 April 2025.
Refinery capacities listed for the area are about 471,000 barrels a day at the Citgo refinery, about 264,000 at the Phillips 66 refinery at Westlake and about 136,000 at Calcasieu Refining.
Chennault International Airport hosts aircraft maintenance businesses, and the Amtrak Sunset Limited stops in the city, but most freight reaches the plants by road, rail and the ship channel.
The city was founded in 1861 and grew from a lumber economy, and today it is regarded as a significant centre of petrochemical refining, tourism and education.
The Lake Charles LNG terminal, just southwest of the city, is one of the few US terminals with facilities for LNG receipt, storage and regasification.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Lake Charles, Louisiana. Lake Charles combines refining, chemicals and LNG export, and the LNG developers and their EPCs often work internationally. A procurement reviewer would expect to see how a device's certificate evidence is structured and what it covers. A dual ATEX and IECEx route is designed to serve those international teams. The IS-04Z1 certificates are in progress and not yet issued.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, chemical plant units, lng liquefaction trains, lng storage and ship loading. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Morning humidity near 90 percent and high annual rainfall mean condensation is common. Choose devices with sealed ports and a suitable ingress rating, and let equipment acclimatise when moving between air-conditioned control rooms and outdoor units, following the manufacturer's guidance.
Equipment usually arrives by road from larger Gulf ports, and the Calcasieu Ship Channel handles ocean-going vessels. Check gate hours and delivery procedures with each plant, since industrial sites often limit vendor access to set windows.
The area is hot, humid and exposed to hurricanes, which affects outage planning. A rugged IP68 handset helps with water and dust, and a managed fleet lets teams lock or locate devices when a site shuts down. Battery storage and charging in safe areas should be part of the outage plan.
Related guides for Lake Charles Louisiana and for United States.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.