PPL: projects and investment
PPL also holds interests in partner-operated producing fields, including the Qadirpur, Sawan and Miano gas fields and the Tal, Nashpa and Gambat blocks, alongside its own operated fields.
Pakistan Petroleum Limited (PPL) is a Karachi-headquartered exploration and production company, 67.51 per cent government owned, best known for the Sui gas field in Balochistan. It also operates fields such as Kandhkot, Mazarani and Chachar. If you are specifying an ATEX and IECEx smartphone for PPL, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for PPL: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | PPL: Gas wellheads and gathering, Gas processing and compression plants, Condensate handling | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
PPL runs an e-procurement portal (eprocurement.ppl.com.pk) through which tenders are issued and bids submitted; confirm vendor registration steps with its support team. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
PPL also holds interests in partner-operated producing fields, including the Qadirpur, Sawan and Miano gas fields and the Tal, Nashpa and Gambat blocks, alongside its own operated fields.
Bolan Mining Enterprises, an equal joint venture with the Balochistan government, runs a 50,000 tonnes-a-year grinding mill at Khuzdar that supplies barytes to oil companies in Pakistan, adding a mineral-dust workplace.
The Sui gas field, discovered in 1952, is the company's flagship project and is in a depletion phase, with PPL as operator holding 100% of both Sui and Kandhkot.
In December 2019 the company announced new oil and gas discoveries in Sindh and Balochistan, so new well sites and gathering facilities are being added in both provinces.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In PPL. A PPL reviewer working on the Sui gas field or Kandhkot would expect certificate evidence that names the model and the marking, rather than a statement of intent. Contractors from other countries may hold ATEX or IECEx evidence, so a dual route helps them compare. The IS-04Z1 programme is in progress and no certificate exists.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
PPL runs an e-procurement portal (eprocurement.ppl.com.pk) through which tenders are issued and bids submitted; confirm vendor registration steps with its support team.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
PPL buys through its own procurement department, normally by tender and vendor registration, with technical review by the operating asset. Confirm the current process and certification requirements directly with PPL's procurement before offering equipment.
Both areas are hot and dry, with high summer temperatures and dust. Handheld devices should have a suitable operating temperature range, good dust protection and a battery that tolerates heat, and the site can confirm its own limits and any restrictions on devices in direct sun.
The IS-04Z1 is designed for intrinsically safe handheld use with IP68 protection, but a final decision depends on the certificate, the gas group and the area classification at each field. Heat, dust and distance from charging points should be planned for. No certificate has been issued yet, so ask PPL's HSE team.
Other guides for PPL, other places in Pakistan, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.