Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
OGDCL · ATEX and IECEx

ATEX and IECEx Mobile Phone for OGDCL

OGDCL is Pakistan's largest exploration and production company, about 85 per cent government owned and listed on the Pakistan Stock Exchange. It operates around 50 oil and gas fields and several processing plants. If you are specifying an ATEX and IECEx mobile phone for OGDCL, this page covers the markings, the approvals and the current certification status of the IS-04Z1.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for OGDCL, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicATEX and IECEx
DeviceMobile Phone
RouteSpecification
WhereOGDCL

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for OGDCL: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · ATEX and IECEx

Checklist: ATEX and IECEx mobile phone for OGDCL

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
MarkingII 2 G Ex ib IIC T4 on the rating plateDesign target; not yet marked
EU-type examination certificateNotified body number and certificate IDIn progress with TÜV; not issued
IECEx certificate of conformityNumber listed on the IECEx online registerIn progress; not issued
Where it appliesOGDCL: Wellheads and well pads, Gas processing plants, Compression facilitiesClassified by the site operator
Product · Pakistan

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The organisation · OGDCL

Oil and Gas Development Company Limited and the IS-04Z1

Where it operates and the kinds of classified area a handset would meet there.

Sites and areas

  • Uch
  • Qadirpur
  • Nashpa (Karak, Khyber Pakhtunkhwa)
  • Kunnar

Classified areas

  • Wellheads and well pads
  • Gas processing plants
  • Compression facilities
  • LPG recovery plants
Supplier approval · OGDCL

Supplier registration at OGDCL

OGDCL publishes tenders and enlistment documents for suppliers and contractors on ogdcl.com; applicants must be on the active taxpayer list and may be visited for premises checks. Confirm current requirements with its procurement team. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.

Field notes · OGDCL

More about OGDCL that matters for portable equipment

OGDCL: rules and approvals

The company is headquartered in Islamabad and listed on the Pakistan Stock Exchange; it has global depositary shares on the London Stock Exchange since 2006, so it works to public-company governance standards.

OGDCL: background

The company began as the Oil & Gas Development Corporation in 1961; its first well, at Toot on the Potwar Plateau, started drilling in November 1964, and it became a public limited company in 1997.

OGDCL: people and language

OGDCL set up an Oil and Gas Training Institute in Karachi in 1977 and moved it to Islamabad in 1979, which indicates an in-house technical training tradition.

OGDCL: who works there

In January 2000 it agreed to take over interests in the Khewari and Sinjhoro blocks and become operator of both, and nine discoveries followed in Sinjhoro between 2001 and 2003.

The term · ATEX and IECEx

What “ATEX and IECEx” means for a smartphone

ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.

For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.

In OGDCL. An OGDCL procurement or HSE reviewer would expect certificate evidence that names the exact equipment, not a generic statement. With around 50 oil and gas fields and several processing plants, contractors and consultants from outside Pakistan also use ATEX or IECEx paperwork they already know. A dual route eases comparison, though the IS-04Z1 certification is still in progress.

The route · specification

Specifying an ATEX and IECEx mobile phone for OGDCL

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · OGDCL

Frequently asked questions

Can OGDCL buy the IS-04Z1 today?

Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.

What does an ATEX and IECEx mobile phone for OGDCL cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

Is the IS-04Z1 ATEX and IECEx certified?

Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.

How does OGDCL approve suppliers?

OGDCL publishes tenders and enlistment documents for suppliers and contractors on ogdcl.com; applicants must be on the active taxpayer list and may be visited for premises checks. Confirm current requirements with its procurement team.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

How hot does it get at OGDCL's Sindh and Punjab fields?

Fields in southern Sindh and south Punjab can see very high summer temperatures with dust, while the north-west and Potwar plateau are cooler in winter. For handheld devices check the rated operating temperature, dust ingress protection and battery behaviour in heat, and ask the site for its limits.

How do suppliers register with OGDCL?

OGDCL runs its own procurement under public-sector procurement rules, usually through tenders and vendor registration, with technical approval by the field or department concerned. Confirm the current registration and certification requirements with OGDCL's procurement office.

What do suppliers need to do to be considered by OGDCL?

OGDCL publishes tenders and enlistment documents for suppliers and contractors on its website, and applicants must be on the active taxpayer list and may be visited for premises checks. Procedures change, so confirm current requirements with its procurement team. The IS-04Z1 has no certificate yet.

Enquiry · OGDCL

Ask about the IS-04Z1 for OGDCL, Pakistan

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · OGDCL

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for OGDCL?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.