OGDCL: rules and approvals
The company is headquartered in Islamabad and listed on the Pakistan Stock Exchange; it has global depositary shares on the London Stock Exchange since 2006, so it works to public-company governance standards.
OGDCL is Pakistan's largest exploration and production company, about 85 per cent government owned and listed on the Pakistan Stock Exchange. It operates around 50 oil and gas fields and several processing plants. If you are specifying an ATEX and IECEx mobile phone for OGDCL, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for OGDCL: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | OGDCL: Wellheads and well pads, Gas processing plants, Compression facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
OGDCL publishes tenders and enlistment documents for suppliers and contractors on ogdcl.com; applicants must be on the active taxpayer list and may be visited for premises checks. Confirm current requirements with its procurement team. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
The company is headquartered in Islamabad and listed on the Pakistan Stock Exchange; it has global depositary shares on the London Stock Exchange since 2006, so it works to public-company governance standards.
The company began as the Oil & Gas Development Corporation in 1961; its first well, at Toot on the Potwar Plateau, started drilling in November 1964, and it became a public limited company in 1997.
OGDCL set up an Oil and Gas Training Institute in Karachi in 1977 and moved it to Islamabad in 1979, which indicates an in-house technical training tradition.
In January 2000 it agreed to take over interests in the Khewari and Sinjhoro blocks and become operator of both, and nine discoveries followed in Sinjhoro between 2001 and 2003.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In OGDCL. An OGDCL procurement or HSE reviewer would expect certificate evidence that names the exact equipment, not a generic statement. With around 50 oil and gas fields and several processing plants, contractors and consultants from outside Pakistan also use ATEX or IECEx paperwork they already know. A dual route eases comparison, though the IS-04Z1 certification is still in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
OGDCL publishes tenders and enlistment documents for suppliers and contractors on ogdcl.com; applicants must be on the active taxpayer list and may be visited for premises checks. Confirm current requirements with its procurement team.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Fields in southern Sindh and south Punjab can see very high summer temperatures with dust, while the north-west and Potwar plateau are cooler in winter. For handheld devices check the rated operating temperature, dust ingress protection and battery behaviour in heat, and ask the site for its limits.
OGDCL runs its own procurement under public-sector procurement rules, usually through tenders and vendor registration, with technical approval by the field or department concerned. Confirm the current registration and certification requirements with OGDCL's procurement office.
OGDCL publishes tenders and enlistment documents for suppliers and contractors on its website, and applicants must be on the active taxpayer list and may be visited for premises checks. Procedures change, so confirm current requirements with its procurement team. The IS-04Z1 has no certificate yet.
More on OGDCL, and on other places in Pakistan.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.