Italy: industry on the ground
The Sarroch refinery in Sardinia, run by Saras since it began operating in 1965, has a refining capacity of about 15 million tonnes a year, equal to roughly 15% of total Italian refining capacity.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refineries, petrochemical poles and gas terminals from Porto Marghera to Priolo and Sarroch. Buyers searching for an ATEX and IECEx cell phone supplier for Italy can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An ATEX and IECEx cell phone for Italy cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Italy: Taranto, Brindisi, Priolo, Melilli and Augusta | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Italy. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Italy market guide.
The Sarroch refinery in Sardinia, run by Saras since it began operating in 1965, has a refining capacity of about 15 million tonnes a year, equal to roughly 15% of total Italian refining capacity.
Directive 2014/34/EU became mandatory for manufacturers on 20 April 2016, replacing Directive 94/9/EC, and equipment groups divide into Group I for mining and Group II for surface industries.
Natural gas supplies more than half of Italian electricity, and an important share of electricity is imported, mainly from Switzerland and France, so gas-fired power stations are a large source of classified areas.
Petroleum is mostly used for transport and natural gas for electricity and heating, so fuel terminals, depots and gas distribution networks are found across the whole country.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Italy. An Italian reviewer at a polo petrolchimico or terminal would expect ATEX evidence under the EU directive and national decree, tied to the plant's zone documents. IECEx papers help international EPCs and contractors working along the coast. A dual route lets one pack serve both. Certification is in progress; no certificate has been issued.
There is no stock to order for Italy yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Italy covers Priolo, Melilli and Augusta, Gela, Milazzo, Sarroch, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Southern Italian summers can be very hot, and direct sun can push surface and battery temperatures up. Check the maximum ambient temperature on the certificate and avoid leaving devices on hot equipment. Coastal and offshore sites add salt air, which affects ports and contacts.
Prepare the EU declaration of conformity, the ATEX or IECEx certificate, Ex marking details and instructions in Italian where required. Italian sites often ask for a safety data pack for contractor equipment, so ask the site safety office for its template before sending devices.
ATEX is the reference in the EU, applied in Italy through national legislation. Some operators and contractors may also ask for IECEx. Ask the operator which evidence it accepts, and note that the IS-04Z1 programme is in progress and no certificate has been issued.
Other guides for Italy, other places in Italy, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.